Laserfiche WebLink
ENVIROVUENTAL IUP40T REPORT.AOPRNOVM lARM1rEONO AANC1r: REV15E0 PROJECT <br />ERP,TEYEER. 2e17 EANTA.ANA, CALIFORNIA <br />increase in water demand h'ad been accounted for in the UNVMP demand projections...As such; the <br />Rei iced Project would not necessitate new or,expanded water entitlements and the.City wonld be <br />able to acconnnodatclhe increased demand for potable water and impacts related ,to water <br />demand would he less 'than significam, The Revised Project Would notresult in new significant. <br />impacts beyond those,idcntifiM in the Certified' EIR. No new.midgation is required. <br />Wastewater. -T le Project site, is located within the jurisdiction of the OCSD. OCSD is <br />responsible for the collection, treatment,aod disposal of domestic, commercial, and industrial <br />wastewater generated by'ovcr 2.5 million people hvingand working iti the central:and <br />northwestern County of (hangc..00SD facilities would receiv4wastewater generated froin'the: <br />Revised Project Wastc\vatcr from,the Revised Project vronld be treated at (5CSD'sReclamatioii <br />PlantNo. 1' liTountain Valley, Through this"facility,-OCSD successfiilly collects, conveys, Arid <br />treats wastewater generated daily in its servicu ;area before discluirging.lhe treated water into the <br />Pacitic.Ocean. Average.flows.for Re lamation Plant No; 1 are 130 million gallonsperday.(mgd) <br />with a total design capacity-of320 mgd.1 <br />The Revised Project includes the installation of a now sanitary sewerlini) that Would connect to <br />an`er'isthig 9 -inch sairitary sewer line in;TvlacAtlhur Roulevard: The Ro iscd Project Is anticipated <br />to result -mi a wasteviater demand of 9,61ipd from the residential uses and a reduction°in <br />wastewater demand for'the chuech campus. The additional wastewater generated froth the <br />additional 42 -.residential homes would be 0:005 percent of the retraining the treatment of <br />the OCSD Reclamation Plant No; I.-Tlierefore, the increased wastewater flows from the Revised <br />Project can be -.accommodated within the existing design capacity of Reclamation Plant -No. 1. <br />The reforc,.the Revised Project's \bastewitter demand would be accommodated by the available' <br />daily treatment capacity at Reclamation Plant No. 1, Reclamation Plant No, l is in compliance <br />with the Santa Ana'Rcgional %Valetunlity Control Boards (RIVQCB's) wastewater tretitinent <br />requtremetiis. ThcRcvised project would iiot require, nor would it result in, the construction of <br />new wastewater lreatttjcni or collet:tion facili(ies or expinsion of;existing facilities The Certified <br />Elli de-termitied that the Approved Prgiect's:wastewater demand would be within ` -the available. <br />treatment capacity of the wastewater system. Therefore, the.Revised Project would notresultin <br />new signifieant4rapaets beyond those -identified in theCcrlified EIR. No new mitigation is <br />required. <br />c) Refer to Response ;2, I$.d. As diseagscd.furdier in Scction'2.5, Hydrology and WatcrQuitlity, the <br />Revised Project wCluld increase impervioivg surfaces 'areas on'lhe Project site, which would <br />increase the volunie,of stormwatcr runoffgcnc rated from the project site. In voltmie and <br />peak flow'o'f runoff from the site has Ilie potential to exceed the capacity of dew istream storm <br />drain systems. Coiisequetttly,-the Revised Project would.be required to comply with the County <br />Municipal Separate IStorm Sewer System (MS4) Permiiandhydromodification requirements, <br />which require that post -construction runoff be reduced to a less than or equal to existing <br />conditions. The Revised Project would also comply with Mitigation Measures HYD -1 through. <br />HYD -3 df the Certified EIR, wliich,require,drainagc improvements to address increases in <br />stormcvatei• runoff. opipliance with MS;t pennit and preparation of the DAMP and WQMP <br />would reduce the Revised Project's impacts related to stnimdrain capacity lu 'i Ii S's than <br />Orange County Sanitation DisfricL Fa(;is.and Ke)' Statiltics. hnPSCliwww.oCSd.eoM.41011le <br />'.h w•Document?idaI0430'(accessed.September3,2017). <br />-HS11n1 GM1AdtrixlwnSAdduulmn,tloux 409+05',17. <br />75B-121 <br />2-72 <br />