My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CF SANTA ANA, LLC
Clerk
>
Contracts / Agreements
>
C
>
CF SANTA ANA, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 3:51:30 PM
Creation date
10/25/2017 9:27:20 AM
Metadata
Fields
Template:
Contracts
Company Name
CF SANTA ANA, LLC
Contract #
A-2017-264
Agency
COMMUNITY DEVELOPMENT
Council Approval Date
10/3/2017
Expiration Date
3/31/2023
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Within a reasonable time prior to the start of any on-site work, delivery of materials, equipment, or personnel. ComraCtor will submit to <br />Owner the following: <br />A- A complete set of drawings approved by Owner and subsequently by the City in which [lie Building is located. <br />13- A fttlly executed Indemnity Agreement (To Be Provided by Owner Upon Request). <br />C- Certificate of Insurance in a form approved by Owner executed by insurance companies acceptable to Owner. <br />O- A filly executed Notification -Rules; for Contractors Jo Be Provided by Owner Upon Request). <br />E- A job schedule of ilio work to be accomplished, detailed by trade. <br />F- A complete list of all proposed Subcontractors and suppliers. Owner must approve all contractors and subcontractors before <br />commencement of their work- <br />G- <br />orkG• The name and phone number (including emergency phone numbers) of personnel who are authorized to represent the Contractor. <br />3- No revisions or changes of any kind may be made to the construction plans previously approved by Owner without prior written consent of <br />the Owner. Any proposed revisions or changes must be submitted to Owner in the form of a change order, for Owner's review and <br />approval prior to commencement of such changes. Revisions or changes altering the floor plan, base building systems, or building <br />operations must be submitted, in writing, to the Owner for review and approval prior to commencement of work <br />4. All of Contractor's work must be scheduled so that it in no way conflicts with, interferes with, or impedes the quiet and peaceful enjoyment <br />of other tenants or occupants of the Project, or with the progress of Owner's work or operations. Any work that is in conflict will be <br />rescheduled by the Contractor to such time as approved by Owner. Additionally, Owner shall have no liability for any costs or expenses <br />incurred by Contractor (or Tenant) in connection with such rescheduling. <br />5. Contractor zatd subcontractors shall employ persons and means for the orderly progress of the work without interruption on account of <br />,dikes, work stoppages or similar causes of delay. Additionally, Owner shall have no liability for any costs or expenses incurred by <br />Contractor (or Tenant) in connection with such delays. <br />6. Materials and tool storage will be limited to the areas for which access has been granted. <br />7. Clean -op and rubbish removal shall be provided by the Contractor at Contractor's expense. Contractor must, ort it daily basis, remove all <br />rubbish, surplus and waste outleri it resulting from the pet'fo-manec of his work. Atthe request of Owner, Contractor shall relocate any <br />materials causing an obstruction as directed by Owner. Contractor will not be allowed to place it dumpster on site on a continuous basis <br />during construction. <br />Important note: The placement and location of rubbish dumpstes and bias must be approved in advance by Owner, <br />8. In general, Owner will interface with Contiactim to the extent necessary for work to be completed within the guidelines of project <br />Specifications and for the enforcement of building rules and regulations, <br />4. Craniactor will make arrangements for reloading, trash removal snit hoisting alter normal working hours clue to the local city noise <br />ordinance. (No such activity will be allowed between the hours of 10:00 p.m. to 7:00 a.m.) At no time will the Contractor be given <br />exclusive reserved use of the freight elevator unless applied For by Contractor and approved by Owner. Contractor may lie afforded access; <br />to loading dock space and hoisting facilities for limited use at such time during normal working hour as is prearranged with Owner, or at <br />Other times, with the consent of Owner and once payment of Owner's Prevailing lee oil after-hours use and access. <br />10. Contractor will be afforded unloading areas os prearranged with Own or. All materials unloaded at these areas will be inaved to an area of <br />use immediately and shall not be stored or used in a ivay which adversely impacts use of the Building. <br />11, Contactor land I Li ant) will be responsible Let the security of Its own materials, equipmem and osak. and that of his subcontractors, <br />Contractor will also be responsible for damage caused by Contractor or its subcontractor to the Project, Building andlor tenant areas, <br />including, but not limited to the loading dock and indoor and outdoor public areas, freight elevators, etc. Any such dumage.s will be <br />promptly repaired to the Owner's satisfaction at sole cost. of Contractor. <br />12, Contractor will comply with all applicable codes, laws Into regulations pertaining to the work of f_'ontraetor, including all safety- and health <br />regulations. The Contractor shall supply the Owoci wilt a Mister List of all Hazardous Materials and their Material Safety Dina Sheets <br />(MSDS) upon delivery to thejob site. A discussion will then ensue perlirining W the safe storage, handling and use of these rnaterio-ds-'Is <br />eeJI as (lie Contractors emergency In Clio edness plan Ior handling the containment and clCal -LIP Of potenti al I1o2aI'd 0(Is Material spills. <br />13. Contractor will not engage in any labor practice that any delay or ctheiwIse impact the work of Ownerorany other contractor. <br />W. No boss building systems will be turned off m disen,paged by Contractor or any subcontractor without prior written npprovnl and <br />supervision by It representative of Owner or its agent Said systems include but are notlimited to sln'inlclers-, electrical circuits. air-hundling <br />units. smoke beads and wnlcr supply. Bsulding electrical power shut. -downs are allowed, with the prior wrincn consent o1' Owner- on <br />$rIuwkos between IODO p.m. and 5:09 a.m. onk. A request for approvxd shall be ;nude to the Property Manager of least ten t lU} dais ill <br />advance. <br />N01 11 Civie Canter Dr— Clh• nJ'Smrtrr .Lm l.errre -4- IL�h ibi t f7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.