15. Doors to all work areas, including stairwells and mechanical and electrical closets, will remain closed at all time. Propping doors open is <br />expressly prohibited. <br />16. All Contractor and subcontractor personnel, materials, tools and equipment fine to enter and exit the Building through the service elevator <br />only. Owner may at any time initiate a check in/check out system, or a badge system, for all people and material in the Building and [he <br />Contractor will agree to cooperate with any such system. <br />17. Before ordering material or doing work which is dependent upon proper size or installation,. the Contractor shall field verify all dimensions <br />for accessibility with building conditions, and shall be responsible for same. <br />18. Contractor shall not permitted any identifying signage or advertising within the Project or Building. <br />19. During construction, Contractor shall maintain supervisory personnel on the site at all times. Such personnel shall be fully authorized to <br />coordinate, respond For and authorize Contractor's work as necessary so as to enable all work to proceed in a timely and well -ordered <br />Fashion. Should Contractor perform work which would cause or require Owner to provide personnel to be present or otherwise perform <br />any work, Contractor shall reimburse Owner for the expense of such personnel. <br />20. Contractor shall be responsible for the protection of its work and the area adjacent to his work. <br />21. Contractor will ensure that all stairwells, mechanical rooms, electrical and telephone closets. etc. accessed by Contractor or subcontractors <br />in conjunction with Contractor's work, will be cleaned and free of debris nightly. <br />22. Public areas adjacent to premises where Contractor's work is being performed shall remain free of debris and materials at all times. <br />23. Contractor shall be responsible for all his actions on site as well as those of its subconhmctors, and shall indemnify, defend and hold <br />harmless the Owner and the other Owner Parties from and against any and all claims, losses, or damages, threatened or incurred, arising <br />fiom the actions or omissions of Contractor or its subcontractors. <br />24. If keys are required by contractors, they must be checked out from the Property Management Office. No key will be distributed if proper <br />identification is not provided. <br />25. No cutting or patching of Owner's premises or installations, or those orany Building occupant, shall be permitted without the prior written <br />consent of Owner. Request for permission to do cutting shall include explicit details and description of work and shall not under any <br />circumstances diminish the structural integrity of the Building or the integrity of any of components or systems. 'the work is to be done <br />only with the explicit written permission of the Property Manager, and only on an "Off -Hours" basis. Such work is to be done only under <br />the direct supervision of a competent member of the Contractor staff. Any such area is to be promptly repaired and returned to a fully <br />Functioning, complete, and clean condition. <br />26. All work is to be done to a minimum standard of quality as required by the Base Building Drawings and Specifications (to be made <br />available by Owner upon request). It is the responsibility of [he Contractor to be fully knowledgeable of the Base Building Drawings and <br />Specifications. <br />27. All Life Safety Systems fertile Building are to be maintained, and all of the Tenant's work is to be properly interfaced with and connected <br />to the Base Building systems as required by Laws, or by Building operation. All work is to be done in such a way as to protect all Base <br />Building operations and wan'anties. Any required disconnection of life safety, devices should be "foreseen" and the Property Management <br />Office must be notified at least 24 hours In advance. Costs For false fire alarms due to contractorsor subcontractors` negligence will be <br />billed to and paid by the Contractor. All life -safety systems testing must be performed on an "after-hours" basis and coordinated with the <br />Building Manager. <br />28. When work is performed by Contractor or subcontractor, charges will apply for additional services performed by Owner which may <br />include, but are not necessarily limited to the following: <br />A - overtime m' after -howl elevator usage <br />B - utility usage for construction activities beyond standard power and water used in connection with general office uses <br />C - extra and contiuutus clean-up of elevators and public spaces as required due to construction octivitpe Contractor to provide the <br />usual protection of existing improvements-, and exercise care and good sense <br />D - extended or after-hours use of the loading dock <br />29. In addition to cleaning requirements described above. Counselor shell, in preparation for substantial complelion or occupancy of the <br />project by Tenant, perforin final cleaning of Contractors Work. <br />30. When Contractor takes over till area from the Owner, before commencing work Contractor shall ascertain that [he area is in a safe and <br />sanitary condition- and maintain the area as necessary (at its sole cost and expense) in a safe and sanitary eondition and to a standard <br />meeting all applicable laws and regulations. <br />31. Owner requires job progress meetings. The Comracou will attend with a representative authorized to speak and act on the Contractor`s <br />behalf. Addilionnlly, the Contractor shall notify the Owner ofscheduledjob progress nscctings. <br />801 IV Chic Cense, Dr—Chy oJSwar, I,, Lerue -5- <br />Ezhbi[ D <br />