My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RENEE ESCARIO DBA RE CONSULTING - 2017
Clerk
>
Contracts / Agreements
>
R
>
RENEE ESCARIO DBA RE CONSULTING - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2019 8:36:36 AM
Creation date
11/27/2017 11:15:58 AM
Metadata
Fields
Template:
Contracts
Company Name
RENEE ESCARIO DBA RE CONSULTING
Contract #
A-2017-265-01
Agency
Planning & Building
Council Approval Date
10/3/2017
Expiration Date
11/7/2020
Insurance Exp Date
10/8/2019
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RE Consulting <br />� •ate •' • <br />Task 1. Project Initiation, Data Gathering and Evaluation, and Site Visit <br />Upon receipt of the Notice to Proceed, Renee Escario will communicate with the Client to discuss the <br />proposed project and to: review and confirm the scope of work, project information, plans and <br />construction details, existing relevant technical studies, and review project design features that could be <br />incorporated into the project. All of the existing relevant project site documentation that has been <br />previously prepared will be reviewed, and a list of any needed information will be provided. <br />Task 1 Deliverable: List of any needed information for the required CEQA documentation. <br />Task 2. Project Description <br />Using the project information provided, a project description will be prepared that will describe the <br />purpose, phasing, construction activities, and operational elements of the project. The project description <br />will also identify the requested discretionary and anticipated subsequent approvals that are required to <br />implement the project, and will include figures showing the location, proposed site plan, and building <br />elevations. In addition, a list of project objectives will be provided in cooperation with the applicant and <br />the City. The project objectives will be carefully crafted to ensure that they meet the goals of the proposed <br />project and provide for an appropriate alternatives analysis, as required in the EIR. Renee will work <br />closely with the City and applicant to ensure that the project description provides a level of detail <br />appropriate to complete the needed technical studies, for the identified objectives, and contains all of the <br />anticipated discretionary actions. <br />A draft project description will be submitted to the City and applicant for review and comment. The <br />document will be revised based on the comments received and a revised project description will be <br />provided. It is anticipated that one round of review and comment will be required. <br />Task 2 Deliverables: Electronic copies (both NIS Woad and Adobe PDP) of the Draft Project <br />Description and Revised Project Description. <br />Task 3. Initial Study and Notice of Preparation <br />As required by CEQA and consistent with City format and guidelines, an Initial Study/Notice of <br />Preparation (IS/NOP) will be prepared and include a description of the project, figures (including a <br />location map, site plan showing the project site boundary and access, existing and proposed zoning and <br />General Plan land use designations, and any other pertinent project information), and the potential <br />environmental effects of the proposed project that need to be evaluated in the EIR. <br />The IS/NOP will be prepared from the City°s environmental checklist form, and written explanations to <br />all checklist questions will clearly define the topics to be addressed in the EIR and explain which do not <br />require further consideration. The IS will enable the City to focus the EIR evaluation toward those <br />environmental areas where potential impacts could be significant and to eliminate from further analysis <br />those environmental areas that would not be significantly impacted by the project. A summary of the <br />-prelnninary detenninations of significance, and anticipated need for further detailed analysis within the <br />EIR is provided in the following table that lists the anticipated EIR topics. <br />
The URL can be used to link to this page
Your browser does not support the video tag.