My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENTERPRISE AUTOMATION (2)-2018
Clerk
>
Contracts / Agreements
>
E
>
ENTERPRISE AUTOMATION (2)-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 6:18:25 PM
Creation date
3/12/2018 11:07:46 AM
Metadata
Fields
Template:
Contracts
Company Name
ENTERPRISE AUTOMATION
Contract #
A-2018-024
Agency
PUBLIC WORKS
Council Approval Date
2/6/2018
Expiration Date
5/5/2021
Insurance Exp Date
11/13/2019
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENTERPRISE <br />AUTOMATION <br />7.4 Control panel design <br />Enterprise Automation <br />210 Goddard Irvine CA 92618 USA <br />Tel 949-760-6000 Fax 949.769-6005 <br />www.eaintePrator,corn <br />Enterprise Automation will develop complete control panel designs for the <br />following sites <br />1. Crooke Pump Station <br />2. Cambridge Pump Station <br />3. System Pressure Reducing Valve Stations (4 total) <br />The designs will be processed for accuracy via a four step process: <br />1. Develop a panel design <br />2. Draft and review the panel drawings <br />3. Submit the panel drawings for City review <br />4. Incorporate the City's comments into the final panel design <br />The PLC panel hardware specifications developed for the Walnut Primp Station <br />project will be used as the basis for panel component selection, <br />The panel design will also draw heavily on the reuse of the San Lorenzo Lift <br />Station panel design and existing EA standards, to minimize project expense and <br />lead time. <br />An important consideration with this approach (i.e. to leverage existing work), is <br />that although EA is currently contracted to. deliver a panel design for the San <br />Lorenzo Lift Station, this task will not be performed until the San Lorenzo project <br />reaches the construction phase. In the event that panel design for this scope of <br />work is initiated prior to the San Lorenzo design, it may be necessary to adjust the <br />Fee Proposal to compensate for the additional design work required. <br />7.4.1 Drawings and dOCUrnentation <br />Enterprise Automation will determine the I/O requirements of the PLC panel, and <br />will develop AutoCAD drawings and documents which will include: <br />1. Front Panel Layout Drawing <br />2. Back Panel Layout Drawing <br />3. Power Distribution Drawing <br />4. Communication Network Drawing <br />5. Analog Inputs/Outputs Drawing <br />6. Digital Inputs/Outputs Drawing <br />7. Wire numbering <br />S. Symbol legend <br />9. Construction notes and fabrication standards <br />Client: City of Santa Ana - Revision: t.0.D <br />Document: Response to RFP 17-112 Date: 11/21/2017 <br />Section_ Scope oF.Services 5 Schedule Pa eg Number__ 14 of 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.