My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH THE MADISON
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
04/17/2018
>
75A - PH THE MADISON
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2018 6:49:43 PM
Creation date
4/12/2018 6:43:20 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
4/17/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />Conditions for Approval for Site Plan Review No. 2016-03 and Variance No. 2017.06 <br />Site Plan Review No. 2016-03 and Variance No. 2017-06 are approved subject to <br />compliance, to the reasonable satisfaction of the Planning Manager, with applicable <br />sections of the Santa Ana Municipal Code, the California Administrative Code, the <br />California Building Standards Code, and all other applicable regulations. In addition, it <br />shall meet the following conditions of approval: <br />The Applicant must comply with each and every condition listed belowrio or to exercising <br />the rights conferred by this site plan review and variances. <br />The Applicant must remain in compliance with all conditions listed below throughout the <br />life of the development project. Failure to comply with each and every condition may result <br />in the revocation of the site plan review and variances. <br />A. Planning Division <br />1. All proposed site improvements must conform to the Site Plan Review approval <br />of DP No. 2016-38. <br />2. The project plans shall be revised to provide the code required parking of 2.0 <br />spaces per unit (520 spaces). <br />3. Any amendment to this site plan review, including modifications to approved <br />materials, finishes, architecture, site plan, landscaping, unit count, mix, and <br />square footages must be submitted to the Planning Division for review. At that <br />time, staff will determine if administrative relief is available or if the site plan <br />review must be amended. <br />4. The project shall comply with all mitigation measures as required by the Metro <br />East Mixed -Use Overlay Zone. <br />5. A residential property manager shall be on site at all times that the project is <br />occupied. <br />6. All new utilities and mechanical equipment such as backflow devices, Edison <br />transformers, and double check detector assembly devices shall not be located <br />within front yard setbacks and must be screened from view from public and <br />courtyard areas. <br />7. All parking for the project, including visitor parking spaces, shall be made <br />available free of charge. <br />8. The interior of the parking structure shall be painted white. <br />Resolution No. 2018 -XX <br />Page 7 of 10 <br />75A-133 <br />
The URL can be used to link to this page
Your browser does not support the video tag.