My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NEWCOMB ANDERSON MCCORMICK, INC - 2018
Clerk
>
Contracts / Agreements
>
N
>
NEWCOMB ANDERSON MCCORMICK, INC - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2018 8:55:57 AM
Creation date
4/13/2018 11:02:02 AM
Metadata
Fields
Template:
Contracts
Company Name
NEWCOMB ANDERSON MCCORMICK, INC
Contract #
A-2018-055
Agency
PUBLIC WORKS
Council Approval Date
3/6/2018
Expiration Date
3/5/2021
Insurance Exp Date
11/9/2019
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal No. 2669.01 Water Enterprise Alternative Energy Feasibility Study <br />REFERENCE: <br />Mr. Marcus L. Fuller, P.E. <br />Assistant City Manager/City Engineer <br />City of Palm Springs <br />3200 E Tahquitz Canyon Way <br />Palm Springs, CA 92263-2743 <br />Ph: (760) 322-8380 <br />Marcus,Fuller@palmsprings-ca.gov <br />P" <br />Newcomb Anderson McCormick reviewed the proposed pricing <br />for each measure and as well as at the overall program level. <br />The "soft costs" (construction management, engineering, <br />general conditions, etc) were compared relative to similar <br />projects NAM had overseen in the public sector, especially as <br />delivered by ESCOs. <br />Newcomb Anderson McCormick reviewed the proposed <br />measurement and verification plan and determined the <br />appropriateness of the approach for each measure and compliance with IPMVP. NAM identified the impacts <br />and risks associated with stipulated portions of the plan versus full measurements, and made appropriate <br />recommendations to protect the Interests of the City, NAM also reviewed the contract and savings guarantees <br />to identify the potential risks to the City, <br />Currently, Newcomb Anderson McCormick provides solar PV construction support to the City. Acting as the <br />"owner's representative" for each phase of the project, NAM has assisted the City in developing a solar RFP and <br />provided solicitation support, proposal evaluation, contract negotiations, contract administration, and design <br />review. The solicitation process was extremely successful, resulting in bids from nearly a dozen vendors, NAM <br />worked with the City to develop a shortlist of three vendors and select the winning bids. Furthermore, when one <br />of the selected contractors dropped out due to unforeseen circumstances, NAM helped the City to revise the <br />scope of work accordingly, resolicit bids, and negotiate with vendors. To ensure that stakeholders and <br />community members were cognizant of the value that the solar PV systems would bring to the City, NAM helped <br />the City present the project to the City Council and obtain Council approval of the project, in addition, NAM's <br />support to the City not only ensured that the system satisfied grant requirements of the South Coast Air Quality <br />Management District (AQMD), but also helped the City achieve more favorable pricing, resulting in the installed <br />system capacity being double the initial estimates. <br />Newcomb Anderson McCormick will continue to provide technical oversight during construction, as well as final <br />solar system QA review, closeout assistance, and performance management, coordinating our work with City <br />staff and personnel from the selected solar provider to contribute to project success. Currently NAM and the <br />City have successfully completed a x MW tracking ground mount solar system at their water treatment plant <br />and a 750 kW fixed tilt ground mount solar system at their animal shelter. <br />Copyright@ Newcomb Anderson McCormick 2017 CITY OF SANTA ANA <br />
The URL can be used to link to this page
Your browser does not support the video tag.