My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NEWCOMB ANDERSON MCCORMICK, INC - 2018
Clerk
>
Contracts / Agreements
>
N
>
NEWCOMB ANDERSON MCCORMICK, INC - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2018 8:55:57 AM
Creation date
4/13/2018 11:02:02 AM
Metadata
Fields
Template:
Contracts
Company Name
NEWCOMB ANDERSON MCCORMICK, INC
Contract #
A-2018-055
Agency
PUBLIC WORKS
Council Approval Date
3/6/2018
Expiration Date
3/5/2021
Insurance Exp Date
11/9/2019
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1®24 Proposal No. 2669.01 Water Enterprise Alternative Energy Feasibility Study <br />Newcomb Anderson McCormick provided Solar Photovoltaic (PV) <br />System Support services to Chaffey College campuses in Rancho <br />Cucamonga, Chino, and Fontana. The project scope included <br />parking lot shade structure systems at all three campuses. The <br />scope of work performed by NAM included an initial solar <br />feasibility analysis to determine the potential size and financial <br />feasibility of the PV system; development of an RFP for design - <br />build firms to construct the proposed system; review and analysis <br />of the submitted proposals, including recommendations <br />regarding selection of the design -build firm. <br />NAM developed a detailed feasibility study that addressed system <br />location, potential layouts, sizing, utility tariff, and ownership options. <br />Cashflow analyses were presented to the District to demonstrate the net <br />benefit resulting from cash purchase vs. PPA. <br />Upon the submittal and approval of the feasibility study, NAM developed <br />a Request for Proposals (RFP) for a solar photovoltaic and energy storage <br />Design -Build contract, which included criteria for system construction <br />and performance, technical sections, instructions to proposers, <br />evaluation criteria and methodology, and key elements of the terms and <br />conditions. NAM then assisted the college to evaluate the proposals, <br />select a vendor and negotiate a final contact with that vendor. <br />NAM assisted the college during the design phase of the project, <br />promptly reviewing and approving design submittals, answering RFls and <br />managing the design process to ensure that all key project deadlines <br />were met. <br />PROJECT AT -A -GLANCE' <br />• System Cost: $15.8 million <br />• System size: 5.6 MW <br />• <br />25 Yr Net Benefit: $8.5M <br />REFERENCE: <br />Ms. Sarah Riley <br />Manager- Facilities Development <br />Chaffey Community College <br />District <br />5885 Haven Avenue <br />Rancho Cucamonga, CA 91737 <br />(909)652-6176 <br />Sarah.Riley@Chaffey.edu <br />During construction, NAM performed construction oversight, advising the college on issues that arose relating to <br />change orders, clarifications and with interconnection to ensure that the client continued to receive maximum <br />return on investment for the installed PV. <br />CITY OF SANTA ANA Copyright© Newcomb Anderson McCormick 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.