My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NEWCOMB ANDERSON MCCORMICK, INC - 2018
Clerk
>
Contracts / Agreements
>
N
>
NEWCOMB ANDERSON MCCORMICK, INC - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2018 8:55:57 AM
Creation date
4/13/2018 11:02:02 AM
Metadata
Fields
Template:
Contracts
Company Name
NEWCOMB ANDERSON MCCORMICK, INC
Contract #
A-2018-055
Agency
PUBLIC WORKS
Council Approval Date
3/6/2018
Expiration Date
3/5/2021
Insurance Exp Date
11/9/2019
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal No. 2669.01 Water Enterprise Alternative Energy Feasibility Study 1-25 <br />The East Bay Regional Park District (EBRPD) operates 65 regional parks, <br />recreation areas, wilderness, shorelines, preserves and land bank areas <br />in Alameda and Contra Costa Counties. With a strong environmental <br />ethic, the District was interested in creating a Strategic Energy Plan as a <br />roadmap for future energy decisions. The District contracted NAM to <br />develop a plan to show how the District could significantly improve its <br />energy efficiency, generate much of Its needed energy on site, reduce <br />energy costs, and significantly decrease its greenhouse gas emissions. <br />Energy use in the parks is concentrated around the structures in each <br />park, some with multiple electric meters. There are 599 structures in <br />the District with a total building area of 851,053 square feet; NAM staff <br />audited 83% of this building area. NAM evaluated the potential to <br />Install PV at every park after efficiency measures. Approximately $1.1 <br />million In retrofit energy projects were identified, including lighting, <br />controls, MVAC, domestic hot water, and pumping projects. $7.2 <br />million in solar photovoltaic (PV) generation projects have been <br />identified. NAM evaluated the potential for a RES -BCT solar PV project <br />at one site, which would supply the entire District's PV needs with one <br />system of 1.5 MW. The economic benefit is not as strong when using <br />RES -BCT, However, it was determined that the lower savings are more <br />than made up for by the Increased economy of scale in installing one <br />large system instead of 50 small PV systems over a wide geographic <br />area. Together, the energy efficiency and PV projects are projected to <br />reduce the District's energy bill by 78%. <br />NAM provided implementation assistance for the strategic energy plan <br />by overseeing and tracking EBRPD self -installation of the identified <br />STRATEGIC ENERGY PLAN <br />• 1.16 MW RES -BCT Carport <br />system with estimated <br />construction cost of <br />approximately $5.2 million <br />• Identification of over $8.3 <br />million in potential energy <br />efficiency and renewable <br />generation projects <br />• Energy savings of over 3.8 <br />million kWh/yr, and projected <br />annual utility cost savings of <br />$631K per year <br />REFERENCE: <br />Jeff Rasmussen <br />Assistant Finance Officer <br />East Bay Regional Park District <br />2950 Peralta Oaks Court <br />P.O. Box 5381 <br />Oakland, CA 94605 <br />J Ra s m ussen @ ebpa rks.ora <br />(510)544-2130 <br />energy efficiency projects and coordinating incentive applications with PG&E for all energy efficiency measures. <br />NAM developed the RFP for solar contractors, assisted the District with proposal evaluations and contract <br />negotiations, and provided technical services to review all solar plan sets and construction documents. NAM also <br />served as the owner's representative for the District throughout the construction of the PV system and assisted <br />the District through the commissioning and utility interconnection processes. <br />NAM is In the process of providing battery storage feasibility analysis to EBRPD. By utilizing NAM's battery <br />storage economic model, EBRPD will be able to identify those meters that benefit from storage solutions. NAM <br />utilizes an algorithm in conjunction with historical 15 minute utility data to simulate and project realistic <br />demand savings. NAM will also provide EBRPD with the most up to date cost Information based on actual pricing <br />as seen from recent industry battery proposals. NAM is investigating the impact of state and federal incentive <br />money dedicated to battery storage and will outline the process for securing these incentives. NAM will deliver a <br />full cash flow analysis that includes the costs, savings, and incentive to help EBRPD identify the viability of <br />battery storage across their largest meters. Upon completion of the feasibility effort, NAM will assist EBRPD with <br />procuring the best storage solution. <br />Copyright © Newcomb Anderson McCormick 2017 CITY OF SANTA ANA <br />
The URL can be used to link to this page
Your browser does not support the video tag.