Laserfiche WebLink
CityofSerittkAna., <br />�a <br />David Knoll, PLS <br />Survey and Right -of -Way Engineering Task Leader <br />- <br />profile Summary <br />4; <br />Education: BS, Cartography, Boston University, Boston <br />" <br />Civil Engineering and Land Surveying Classes, California State Universlty, Long Beach <br />Registration: Land Surveyor, California No. 5301 <br />k>i <br />Affiliations: California Land Surveyors Association <br />Southern California Experts & Consultants <br />Experience: 41 Years <br />I <br />Transportation Authority, Los Angeles, California. Survey Task Leader responsible for providing and <br />Mr. David Knell has been Involved in preparing and checking numerous parcel maps and tract maps, ALTA <br />- <br />surveys, records -of -survey, lot line adjustments, parcel map waivers, certificates of compliance, and bound- <br />, <br />ary determination, He is responsible for preparing legal descriptions and sketches for a wide range of ease- <br />ments involving utilities, air space reservations, and construction projects. Mr. Knell works with major utill- <br />La <br />ties and title companies in determining easements and correcting defective legal descriptions, His exped- <br />,..ti <br />ence includes supervising Ilaid crews, overseeing an office staff dealing with various survey projects, and <br />r ., <br />extensive experience with local, state, and federal agencies. <br />Relevant project Experience <br />Emerald Bay Main Gate safety Improvements, Emerald Bay Service District, Laguna Beach, Califor- <br />nia, Survey and Right -of -Way Engineering Task Leader responsible for oversight of all office and field Sur- <br />ur-veyservices <br />vey servicesand preparing necessary eight -of -way, engineering documentation. Wilidan provided civil and <br />traffic engineering design and other appurtenant services for safety improvements at the main gate en- <br />r <br />trance, Improvoments involved road widening, guardhouse relocation and reconstruction; grading to accom- <br />i. <br />ramps, and retaining and monument wails; widening the right -tum pocket and installing a median; and In- rm <br />stalling street striping and signage within Galtrans' right-of-way. <br />�a <br />Firestone (Boulevard Capacity Enhancement, City of South Gate, California. Survey Task Leader re- <br />sponsible for providing and overseeing all mapping and right-of-way engineering required for the corridor <br />r <br />Improvements from Alameda Street to Hunt Avenue. The improvements involved roadway widening from <br />4; <br />four to six lanes; pavement rehabilitation; landscape and hardscape medians; median lighting; sidewalk, <br />curb and gutter, and driveway approach reconstruction; ADA -compliant ramps; parkway tress, artistic ele- <br />ments, corridor entrance monument; bus shelter and bus turnouts; and traffic signal modifications. Services <br />k>i <br />provided Included civil, traffic, pavement, and drainage engineering; landscape architecture, survey and <br />right-of-way engineering; and utility relocation. <br />Orange Line Extension, Brutoco Engineering & Construction, IncJLos Angeles County Metropolitan <br />a. d <br />Transportation Authority, Los Angeles, California. Survey Task Leader responsible for providing and <br />overseeing all mapping and right-of-way engineering required for the design/build of the MOL extension <br />; <br />from the Chatsworth Station to Canoga Station in the San Fernando Valley along Canoga Avenue. Wliidan <br />, <br />prepared plans, specifications, and estimate for street widening, raised landscaped medians; irrigation sys- <br />tem, ADA access curb ramps, bloyele paths, park -and -rids and parking lot facilities, traffic signal modifloa- <br />r <br />lions, communication conduits, and signing and striping. <br />,..ti <br />Los Alamitos Boulevard Median Improvements, City of Los Alamitos, California. Survey Task Leader <br />responsible for providing and overseeing all mapping and right-of-way engineering required for the Improve- <br />ments between Cerritos Avenue and Katella Avenue, Improvements Involved raised median, pavement de- <br />lineation, landscape and irrigation Improvements, street lighting and traffic signal improvements at Intersec- <br />tions with Florista Street and Sausalito Street. There was also minor traffic signal modification at Intersec- <br />tions with Katella Avenue and Cerritos Avenue. <br />Comprehensive, innovative. Trusted. <br />25E-672 <br />uJ <br />Proposal for en -Cull Engineering, <br />RFP No. 17-083 <br />