|
CityofSerittkAna.,
<br />�a
<br />David Knoll, PLS
<br />Survey and Right -of -Way Engineering Task Leader
<br />-
<br />profile Summary
<br />4;
<br />Education: BS, Cartography, Boston University, Boston
<br />"
<br />Civil Engineering and Land Surveying Classes, California State Universlty, Long Beach
<br />Registration: Land Surveyor, California No. 5301
<br />k>i
<br />Affiliations: California Land Surveyors Association
<br />Southern California Experts & Consultants
<br />Experience: 41 Years
<br />I
<br />Transportation Authority, Los Angeles, California. Survey Task Leader responsible for providing and
<br />Mr. David Knell has been Involved in preparing and checking numerous parcel maps and tract maps, ALTA
<br />-
<br />surveys, records -of -survey, lot line adjustments, parcel map waivers, certificates of compliance, and bound-
<br />,
<br />ary determination, He is responsible for preparing legal descriptions and sketches for a wide range of ease-
<br />ments involving utilities, air space reservations, and construction projects. Mr. Knell works with major utill-
<br />La
<br />ties and title companies in determining easements and correcting defective legal descriptions, His exped-
<br />,..ti
<br />ence includes supervising Ilaid crews, overseeing an office staff dealing with various survey projects, and
<br />r .,
<br />extensive experience with local, state, and federal agencies.
<br />Relevant project Experience
<br />Emerald Bay Main Gate safety Improvements, Emerald Bay Service District, Laguna Beach, Califor-
<br />nia, Survey and Right -of -Way Engineering Task Leader responsible for oversight of all office and field Sur-
<br />ur-veyservices
<br />vey servicesand preparing necessary eight -of -way, engineering documentation. Wilidan provided civil and
<br />traffic engineering design and other appurtenant services for safety improvements at the main gate en-
<br />r
<br />trance, Improvoments involved road widening, guardhouse relocation and reconstruction; grading to accom-
<br />i.
<br />ramps, and retaining and monument wails; widening the right -tum pocket and installing a median; and In- rm
<br />stalling street striping and signage within Galtrans' right-of-way.
<br />�a
<br />Firestone (Boulevard Capacity Enhancement, City of South Gate, California. Survey Task Leader re-
<br />sponsible for providing and overseeing all mapping and right-of-way engineering required for the corridor
<br />r
<br />Improvements from Alameda Street to Hunt Avenue. The improvements involved roadway widening from
<br />4;
<br />four to six lanes; pavement rehabilitation; landscape and hardscape medians; median lighting; sidewalk,
<br />curb and gutter, and driveway approach reconstruction; ADA -compliant ramps; parkway tress, artistic ele-
<br />ments, corridor entrance monument; bus shelter and bus turnouts; and traffic signal modifications. Services
<br />k>i
<br />provided Included civil, traffic, pavement, and drainage engineering; landscape architecture, survey and
<br />right-of-way engineering; and utility relocation.
<br />Orange Line Extension, Brutoco Engineering & Construction, IncJLos Angeles County Metropolitan
<br />a. d
<br />Transportation Authority, Los Angeles, California. Survey Task Leader responsible for providing and
<br />overseeing all mapping and right-of-way engineering required for the design/build of the MOL extension
<br />;
<br />from the Chatsworth Station to Canoga Station in the San Fernando Valley along Canoga Avenue. Wliidan
<br />,
<br />prepared plans, specifications, and estimate for street widening, raised landscaped medians; irrigation sys-
<br />tem, ADA access curb ramps, bloyele paths, park -and -rids and parking lot facilities, traffic signal modifloa-
<br />r
<br />lions, communication conduits, and signing and striping.
<br />,..ti
<br />Los Alamitos Boulevard Median Improvements, City of Los Alamitos, California. Survey Task Leader
<br />responsible for providing and overseeing all mapping and right-of-way engineering required for the Improve-
<br />ments between Cerritos Avenue and Katella Avenue, Improvements Involved raised median, pavement de-
<br />lineation, landscape and irrigation Improvements, street lighting and traffic signal improvements at Intersec-
<br />tions with Florista Street and Sausalito Street. There was also minor traffic signal modification at Intersec-
<br />tions with Katella Avenue and Cerritos Avenue.
<br />Comprehensive, innovative. Trusted.
<br />25E-672
<br />uJ
<br />Proposal for en -Cull Engineering,
<br />RFP No. 17-083
<br />
|