Laserfiche WebLink
City ofSanta Arta <br />Mohae n Rahlmlan, PE, GE <br />`I <br />Material Testing Engineer <br />Profile Summary <br />Education: MS, Civil Engineering, Tehran University, Tehran <br />i Registration. OMI Engineer, California, No. 73396 <br />Geotechnical Engineer, California, No, 8059 <br />Experlence: 29 Years <br />Mr. Mohsen Rahimlen possesses expertise in geotschnical and material engineering, testing, Investiga- <br />tion, design, and construction and has lent that expertise to a wide spectrum of public works projects. Mr. <br />Rahimlan has substantial experience In conducting and managing geoteohnical and material testing and <br />Inspection services during construction. He has performed diversified geotechnical assignments, Including <br />pavement design, shallow and deep foundation design, settlement evaluations, liquefaction studies, and <br />slope stability analyses, Mr. Rahimian experience includes geotechnical, civil, and structural design and <br />' construction management. <br />! ; Relevant Project Experience <br />Emerald Bay Main gate Safety Improvements, Emerald Say Service District, Laguna Beach, Califor- <br />nia. Geoteohnical Engineer responsible for quality assurance materials testing. Wilidan provided civil and <br />traffic engineering design and other appurtenant services for safety improvements at the main gate an - <br />trance. Improvements Involved road widening, guardhouse relocation and reconstruction; grading to accom- <br />modate the roadway widening and landscaping; installing upgraded lighting, ADA -compliant curbs and <br />ramps, and retaining and monument walls; widening the right -turn pocket and installing a median; and ln- <br />I stalling street striping and signage within Caltrans' right-of-way. <br />Placentia Metrolink Station Phase I and II, Orange County Transportation Authority, Orange County, <br />California. Geotechnical Engineer responsible for quality assurance materials testing required for infra- <br />structure Improvements for the now station. The project site involved approximately 4.75 acres to provide a <br />Metrolink commuter rail station that meets current and future transit demand and ADA requirements. The <br />project goal fostered train ridership growth in the region, The station was planned as part of a key compo- <br />nent of transit-orlented development envisioned In the Westgate Specific Plan for the City of Placentia, The <br />' project improvements included street, railroad track, and pedestrian improvements; rail platforms; and light - <br />Ing, signing and striping of four parking facilities for 425 vehicles. <br />Orange Line Extension, Brutoco Engineering & Construction, IncdLcs Angeles County Metropolitan <br />Transportation Authority, Los Angeles, California. Geotechnical Engineer responsible for quality assur- <br />anoo materials testing required for the design/build of the MOL extension from the Chatsworth Station to <br />Canoga Station in the San Fernando Valley along Canoga Avenue, Wilidan prepared plans, specifications, <br />and estimate for street widening, raised landscaped medians, Irrigation system, ADA access curb ramps, <br />bicycle paths, park•and-rids and parking lot facilities, traffic signal modifications, communication conduits, <br />and signing and atriping. <br />Firestone Boulevard Capacity Enhancement, City of South Gate, California. Geotechnical Engineer <br />responsible for quality assurance materials testing required for the corridor improvements from Alameda <br />{ Street to Hunt Avenue. The improvements Involved roadway widening from four to six lanes; pavement re- <br />habilitation; landscape and hardscape medians; median lighting; sidewalk, curb and gutter, and driveway <br />l approach reconstruction; ADA -compliant ramps; parkway trees; artistic elements, corridor entrance monu- <br />ment, bus shelter and bus turnouts; and traffic signal modifications. Services provided Included civil, traffic, <br />pavement, and drainage engineering; landscape architecture, survey and dight -of -way engineering; and util- <br />ity relocation. <br />I <br />Comprehensive. Innovative, Trusted, <br />25E-673 <br />Proposal for en�Coll Engineering, 11 <br />RPP No. 17 -OSS <br />