|
City ofSanta Arta
<br />Mohae n Rahlmlan, PE, GE
<br />`I
<br />Material Testing Engineer
<br />Profile Summary
<br />Education: MS, Civil Engineering, Tehran University, Tehran
<br />i Registration. OMI Engineer, California, No. 73396
<br />Geotechnical Engineer, California, No, 8059
<br />Experlence: 29 Years
<br />Mr. Mohsen Rahimlen possesses expertise in geotschnical and material engineering, testing, Investiga-
<br />tion, design, and construction and has lent that expertise to a wide spectrum of public works projects. Mr.
<br />Rahimlan has substantial experience In conducting and managing geoteohnical and material testing and
<br />Inspection services during construction. He has performed diversified geotechnical assignments, Including
<br />pavement design, shallow and deep foundation design, settlement evaluations, liquefaction studies, and
<br />slope stability analyses, Mr. Rahimian experience includes geotechnical, civil, and structural design and
<br />' construction management.
<br />! ; Relevant Project Experience
<br />Emerald Bay Main gate Safety Improvements, Emerald Say Service District, Laguna Beach, Califor-
<br />nia. Geoteohnical Engineer responsible for quality assurance materials testing. Wilidan provided civil and
<br />traffic engineering design and other appurtenant services for safety improvements at the main gate an -
<br />trance. Improvements Involved road widening, guardhouse relocation and reconstruction; grading to accom-
<br />modate the roadway widening and landscaping; installing upgraded lighting, ADA -compliant curbs and
<br />ramps, and retaining and monument walls; widening the right -turn pocket and installing a median; and ln-
<br />I stalling street striping and signage within Caltrans' right-of-way.
<br />Placentia Metrolink Station Phase I and II, Orange County Transportation Authority, Orange County,
<br />California. Geotechnical Engineer responsible for quality assurance materials testing required for infra-
<br />structure Improvements for the now station. The project site involved approximately 4.75 acres to provide a
<br />Metrolink commuter rail station that meets current and future transit demand and ADA requirements. The
<br />project goal fostered train ridership growth in the region, The station was planned as part of a key compo-
<br />nent of transit-orlented development envisioned In the Westgate Specific Plan for the City of Placentia, The
<br />' project improvements included street, railroad track, and pedestrian improvements; rail platforms; and light -
<br />Ing, signing and striping of four parking facilities for 425 vehicles.
<br />Orange Line Extension, Brutoco Engineering & Construction, IncdLcs Angeles County Metropolitan
<br />Transportation Authority, Los Angeles, California. Geotechnical Engineer responsible for quality assur-
<br />anoo materials testing required for the design/build of the MOL extension from the Chatsworth Station to
<br />Canoga Station in the San Fernando Valley along Canoga Avenue, Wilidan prepared plans, specifications,
<br />and estimate for street widening, raised landscaped medians, Irrigation system, ADA access curb ramps,
<br />bicycle paths, park•and-rids and parking lot facilities, traffic signal modifications, communication conduits,
<br />and signing and atriping.
<br />Firestone Boulevard Capacity Enhancement, City of South Gate, California. Geotechnical Engineer
<br />responsible for quality assurance materials testing required for the corridor improvements from Alameda
<br />{ Street to Hunt Avenue. The improvements Involved roadway widening from four to six lanes; pavement re-
<br />habilitation; landscape and hardscape medians; median lighting; sidewalk, curb and gutter, and driveway
<br />l approach reconstruction; ADA -compliant ramps; parkway trees; artistic elements, corridor entrance monu-
<br />ment, bus shelter and bus turnouts; and traffic signal modifications. Services provided Included civil, traffic,
<br />pavement, and drainage engineering; landscape architecture, survey and dight -of -way engineering; and util-
<br />ity relocation.
<br />I
<br />Comprehensive. Innovative, Trusted,
<br />25E-673
<br />Proposal for en�Coll Engineering, 11
<br />RPP No. 17 -OSS
<br />
|