Laserfiche WebLink
---'.. -,.-. ----- --,-,------ ---_...--- --- - ---- , -- -, -- -.-_...-a_.,_ - -.1 __ - - <br />edroad widening, guardhouse relocation and reconstruction; grading to accommodate the roadway <br />r-1 <br />City of Santa Ana <br />i.. <br />Johnny Ghazal, PS, QSD <br />Civil Engineering Task Leader <br />r° <br />profile Summary <br />Education: BS, Civil Engineering, California Polytechnic Stats University, Pomona <br />F' <br />Registration: Civil Engineer, California No. 79895 <br />j:_ <br />Qualified SWPPP DevelopedPractitioner, California Stormwater Quslity Association No, 849 <br />wJ <br />Affiliations: American Society of Civil Engineers <br />t <br />Experience: 14'Vears <br />" <br />Mr. Johnny Ghazal possesses diversified civil engineering experience throughout California covering pub- <br />A <br />fc works and private sector projects, preceded by six years of residential and commercial construction ex- <br />perience. His private sector experience Includes designing master -planned communities involving tentativs <br />tract maps; grading plans; Improvement plans for streets, water, and sewer; and storm drain facilities. Mr. <br />v <br />Ghazal's experience includes design of capital Improvement projects for street, water, sewer, and storm <br />L <br />drain Improvements. <br />As a certified QSD, Mr. Ghazal has facilitated water quality related permitting - having prepared and re- <br />d <br />viewed many storm water pollution prevention plans and water quality management plans for various public <br />agencies, He currently assists multiple agendas with data, entry on the State's SMARTS system. <br />Relevant project Experience <br />r' <br />Emerald Bay Main Gate Safety Improvements, Emerald Bay Service District, Laguna Beach, Califor- <br />nia. Civil Design Engineer responsible for assisting with drainage and other civil improvement design. Per- <br />formance of these responsibilities requires expertise and knowledge in City and County standards, guide- <br />,a <br />lines, and procedures and hydrology and hydraulic modeling. Wilidan provided civil and traffic engineering <br />" <br />---'.. -,.-. ----- --,-,------ ---_...--- --- - ---- , -- -, -- -.-_...-a_.,_ - -.1 __ - - <br />edroad widening, guardhouse relocation and reconstruction; grading to accommodate the roadway <br />r-1 <br />widening and landscaping; Installing upgraded lighting, ARA-compilant curbs and ramps, and retaining and <br />L,i <br />monument waifs; widening the -right -tum pocket and installing a median; and installing street striping and <br />signage within Caltrans' right-of-way, <br />r° <br />Orange Line Extension, Srutoco Engineering & Construction, fncJLos Angeles County Metropolitan <br />Transportation Authority, Los Angeles, California. Chill Design Engineer responsible for assisting with <br />drainage and other civil Improvement design for the design/build of the MCL extension from the Chatsworth <br />Station to Canoga Station In the San Fernando Valley along Canoga Avenue. Performance of these respon- <br />wJ <br />sf illities required expertise arid knowledge with City and County standards, guidelines, and procedures; trail <br />- <br />design. Willdan prepared plans, specifications, and estimate for street widening, raised landscaped medi- <br />ans, irrigation system, ADA access curb ramps, bkyrda paths, park-and-ride and parking lot facilities, traffic <br />signal modifications, communication conduits, and signing and striping. Three stations were constructed or <br />reconstructed. <br />Ninth Street Safety Improvements, City of Highland, California. Civil Design Engineer responsible for <br />v <br />assisting with drainage and other civil Improvement design for street widening at specific locations. Perfor- <br />manoe of these responsibilities required expertise and knowledge in highway design, pavement rehabli8a- <br />tion strategies, and addressing impacts to privets properties for transitioning the improvements. Project im- <br />d <br />provements involved slurry sealing the project limits; restriping the project limits to Incorporate two 1:I -foot <br />through lanes, one 12 -foot two-way left -turn lane, 5 -foot Class 11 bicycle lanes; and 8 -foot parking lanes; in- <br />stalling pedestrian count -down heads at five signalized intersections; and Installing an in -pavement roadway <br />lighting system with advance flashing beacons. Services provided Include civil, traffic, pavement, and drain- <br />age engineering, survey and right-of-way engineering, utility coordination and relocation, and landscape ar- <br />chitecture. <br />,a <br />Comprohenslve. Innovative. Trusted. <br />25E-674 <br />Proposal for On-Cafl Engineering, <br />RFP No. V083 4g <br />