City of Santa Ana
<br />Relevant Project Experience
<br />Wilidan has chosen the following representative summaries for completed projects that exemplify Wilidan's
<br />extensive expertise and relation to the Scope of Work detailed in the RFP.
<br />City of o'
<br />♦ Calffornia
<br />South Gate, 9080
<br />Client Contact: Arturo Cervantes, Public Works Diec
<br />tor
<br />(323) 563.8512
<br />Wilidan is providing civil and traffic engineering de- Prajact Dates: 2truc io ong idesign oompPeted, con -
<br />p g g 9 sruot%n ongoing}
<br />sign and other appurtenant services for street im- Project Team: Pyrone Peter, David Knell, John Ni-
<br />provements from Alameda Street to Hunt Avenue daigo, Vanessa Muficz, Mohnen Rshimian, Salvador
<br />funded through Metro and local funds. The project Is Lopez, Alexis Escobar, Ross Kialabani, Flay Wellington,
<br />a complete rehabilitation of roadway improvements Michael Bustos, Kenneth Krieger, Randy Shadowen, Ber-
<br />that involve widening the street from four to six; reha- nardo Reyes, Susana Bardentos, Bryan Nguyen, Sheite
<br />b€litating street pavement sections, including local- McCracken, Robert Burch, Chds Stone, Edward Cox,
<br />ized removal and replacement of failed roadway; in- Christopher Kelley. Kevin Custedo, Nicolle Spann, Robert
<br />stalling landscaped and hardscapsd medians, Incl -d- Sun, Elroy Ki
<br />Ryan Moore
<br />Ing drought -resistance plants, irrigation system, and lighting
<br />system; reconstructing deficient sidewalk, curb, gutter,
<br />driveway approaches, and ADA -noncompliant curb ramps;
<br />planting street parkway trees without irrigation, green
<br />streets technologies, and complete streets
<br />Artistic elements and gateway corridor entrance are in-
<br />cluded in the design. Other improvements include bus shel-
<br />ters and bus turnouts; traffic signal modifications with bat-
<br />tery backup, pedestrian countdown heads, and upgrades to LED where possible. Signals will be synchro-
<br />nized to reduce traffic congestion and improve bus speeds.
<br />Eos Alamitos Boulevard Median Improvements
<br />City of Los Alamitos
<br />3131 Katalle Avenue
<br />Los Alamitos„ CA 90720
<br />W€lldan provided civil and traffic engineering and
<br />other appurtenant services for street improvements
<br />between Cerritos Avenue and Katella Avenue. As
<br />one of three Improvement segments, the project In-
<br />volves raised medians with landscaping and irdga-
<br />tion, hardware, decorative street lights, electrical re-
<br />ceptacles for seasonal tree lighting, tree upiights and
<br />monument signs. Median improvements were opti-
<br />mized through traffic analysis and vehicle turning
<br />movement modeling.
<br />Crosswalks at four signalized Intersections will be re-
<br />moved and replaced with integral colored concrete. A
<br />storm drain on Serpentine Drive will be modified. Por-
<br />tions of the project limits will receive a 12 -inch -thick
<br />full -depth asphalt concrete over d -Inch -thick com-
<br />pacted subgrade. Wilidan assisted the City with public outreach to gamer input through town hall meetings,
<br />open houses, and public hearings.
<br />Client
<br />Steven Mendoza, Community Development
<br />Contact:
<br />Director
<br />(562) 431-3538 extension 300
<br />Project
<br />2015 to 2017 (design completed; construc-
<br />Dates:
<br />tion ongoing)
<br />Project
<br />Tyrone Peter, David Knoll, John Hidalgo,
<br />Team:
<br />Mahsen Rahimian, Michael Bustos, Randy
<br />Shadowen, Bernardo Reyes, Susama Bar-
<br />rientos, Bryan Nguyen, Sheila McCracken,
<br />Robert Burch, Chris Stone, Edward Cox,
<br />Kevin Custado, Elroy Klepke
<br />Comprehensive. Innovative. Trusted.
<br />25E-687
<br />Proposal for On -Call Engineering 25
<br />RFP No. 17,083