Laserfiche WebLink
City of Santa Ana <br />Relevant Project Experience <br />Wilidan has chosen the following representative summaries for completed projects that exemplify Wilidan's <br />extensive expertise and relation to the Scope of Work detailed in the RFP. <br />City of o' <br />♦ Calffornia <br />South Gate, 9080 <br />Client Contact: Arturo Cervantes, Public Works Diec <br />tor <br />(323) 563.8512 <br />Wilidan is providing civil and traffic engineering de- Prajact Dates: 2truc io ong idesign oompPeted, con - <br />p g g 9 sruot%n ongoing} <br />sign and other appurtenant services for street im- Project Team: Pyrone Peter, David Knell, John Ni- <br />provements from Alameda Street to Hunt Avenue daigo, Vanessa Muficz, Mohnen Rshimian, Salvador <br />funded through Metro and local funds. The project Is Lopez, Alexis Escobar, Ross Kialabani, Flay Wellington, <br />a complete rehabilitation of roadway improvements Michael Bustos, Kenneth Krieger, Randy Shadowen, Ber- <br />that involve widening the street from four to six; reha- nardo Reyes, Susana Bardentos, Bryan Nguyen, Sheite <br />b€litating street pavement sections, including local- McCracken, Robert Burch, Chds Stone, Edward Cox, <br />ized removal and replacement of failed roadway; in- Christopher Kelley. Kevin Custedo, Nicolle Spann, Robert <br />stalling landscaped and hardscapsd medians, Incl -d- Sun, Elroy Ki <br />Ryan Moore <br />Ing drought -resistance plants, irrigation system, and lighting <br />system; reconstructing deficient sidewalk, curb, gutter, <br />driveway approaches, and ADA -noncompliant curb ramps; <br />planting street parkway trees without irrigation, green <br />streets technologies, and complete streets <br />Artistic elements and gateway corridor entrance are in- <br />cluded in the design. Other improvements include bus shel- <br />ters and bus turnouts; traffic signal modifications with bat- <br />tery backup, pedestrian countdown heads, and upgrades to LED where possible. Signals will be synchro- <br />nized to reduce traffic congestion and improve bus speeds. <br />Eos Alamitos Boulevard Median Improvements <br />City of Los Alamitos <br />3131 Katalle Avenue <br />Los Alamitos„ CA 90720 <br />W€lldan provided civil and traffic engineering and <br />other appurtenant services for street improvements <br />between Cerritos Avenue and Katella Avenue. As <br />one of three Improvement segments, the project In- <br />volves raised medians with landscaping and irdga- <br />tion, hardware, decorative street lights, electrical re- <br />ceptacles for seasonal tree lighting, tree upiights and <br />monument signs. Median improvements were opti- <br />mized through traffic analysis and vehicle turning <br />movement modeling. <br />Crosswalks at four signalized Intersections will be re- <br />moved and replaced with integral colored concrete. A <br />storm drain on Serpentine Drive will be modified. Por- <br />tions of the project limits will receive a 12 -inch -thick <br />full -depth asphalt concrete over d -Inch -thick com- <br />pacted subgrade. Wilidan assisted the City with public outreach to gamer input through town hall meetings, <br />open houses, and public hearings. <br />Client <br />Steven Mendoza, Community Development <br />Contact: <br />Director <br />(562) 431-3538 extension 300 <br />Project <br />2015 to 2017 (design completed; construc- <br />Dates: <br />tion ongoing) <br />Project <br />Tyrone Peter, David Knoll, John Hidalgo, <br />Team: <br />Mahsen Rahimian, Michael Bustos, Randy <br />Shadowen, Bernardo Reyes, Susama Bar- <br />rientos, Bryan Nguyen, Sheila McCracken, <br />Robert Burch, Chris Stone, Edward Cox, <br />Kevin Custado, Elroy Klepke <br />Comprehensive. Innovative. Trusted. <br />25E-687 <br />Proposal for On -Call Engineering 25 <br />RFP No. 17,083 <br />