Laserfiche WebLink
City of Santa Ana <br />Orange Line Extension <br />Los Angeles Metropolitan Transit Authority! <br />Client Contact: Scott McConnell, Project Manager <br />Brutoco Engineers and Constructors, Inc. <br />(2t3) 922-7257 <br />One Gateway Plaza <br />Project Dates: 2070 to 2012 <br />Los Angeles, CA 90012 <br />Project Team: Tyrone Peter, David Knelt, Johnny <br />design -build MOL extension between Chats- <br />GhaThe <br />Moilseen� lan, RahimJohn R a ftabaVanessa �uriozRay <br />worth and Canoga Stations in the San Fernando Val- <br />wellington, Michael Bustos, Kenneth <br />ley along Canoga Avenue is a dedicated roadway <br />Krieger, Randy Shadowen, Bernardo <br />consisting of two 14 -foot travel lanes. At stations, the <br />Reyes, Susana Bardentos, Bryan Ngu- <br />busway lane widens to provide passing lanes for <br />yen, Sheila McCracken, Robart Burch, <br />buses, The 28400t wide roadway is within the Metro <br />Chris Stone, Edward Cox Christopher <br />right-ot-way and Is 100 feet wide In most locations — <br />Kelley, Ryan Moore <br />providing adequate room for landscaping as well as space for <br />fences, privacy walls, drainage facilities, and a bikewayipades- <br />trian path adjacent to the busway. <br />The busway was designed for future conversion to light-rail <br />transit service. A Class i bikeway that includes a pedestrian <br />path was designed and constructed within the Metro right-of- <br />way from the terminus of the existing MOL btkewayipedestrian <br />path at Canoga Avenue, north to Lassen Street and along Las- <br />sen Street to connect within the existing bike path on the east <br />side of the existing Browns Creek drainage channel. Street and <br />pedestrian crossings were improved on nine streets where the <br />busway Intersects the crossing street. A bus parking tot was <br />constructed on -the .Metro=owned.property_at.Mariila Street and <br />Owensmouth Avenue. Park-and-ride facilities were included at <br />throe stations, providing approximately 1,074 additional park - <br />Ing spaces. Resign -build solutions and design creativity re- <br />duced MTA's construction estimate and saved over $61 million <br />In construction costs. <br />Measure R Vrolea:001,dals CelarateCranpletionaNetao <br />Orange Line Extension to Chats dh Ahead of Schedule. <br />Under Budget <br />Emerald Bay Main Gate Safety Improvements <br />Emerald Bay Service District Client Contact. Michael Dunbar, General Manager <br />600 Emerald Bay (949) 494-8572 <br />Laguna Beach, CA 92651 Project Dates: 2015 to 2017 <br />Willdan Is providing civil and traffic engineering de- Project Team; Tyrone Peter, David Knell, Johnny <br />sign and other appurtenant services for safety Ifn- Ghazal, Gary Gordon, Vanessa Mutfoz, Monsen Rahlm- , <br />provements connected with the community's main tan, Ross Khlebam, Ray wellington, Michael Bustos, <br />gate entrance. The Improvements involve widening Kenneth Krieger, Randy Shadowen, Bernardo Reyes, <br />Shamrock Road 25 feet, reconstructing the entrance Susena Barrientos, Sheila McCracken, Robert Burch, Ed - <br />guardhouse approximately 40 feet north of the exist- ward Cox, Christopher Kelley, Kevin Custado, Ryan <br />ing location, grading Shamrock Road and the adja- Moore <br />cent slope to accommodate the roadway widening and <br />desired landscaping; installing upgraded lighting; In- j 1 <br />stalling ADA -compliant curbs, ramps and retatningimon- <br />ument walls; widening the right -turn pocket and In- <br />stalling a 175400t•long raised median at the Intersec- <br />tion of Pacific Coast Highway and Shamrock Road; mit- <br />igating soil with 20018 -inch diameter drilled displace- <br />ment <br />isplace ment columns, and Installing street striping and slgnags <br />within Caltrans' right-of-way. The project required processing Caltrans encroachment permit and County of <br />Orange general grading permit packages. Widening Shamrock Road proAdes an additional lane In each <br />m bN� Proposal for On -Call Engineering, 2;1 <br />..i Comprehensive. Innovative, Trusted. RFP No. 17.083 , <br />25E-688 <br />