Laserfiche WebLink
City of Santa Ana <br />consist of two shoots and will be drafted at 20 -scale. The Roadway improvement plans wilt Include the topo- <br />graphic survey and utility base plan Information, limits of removal, and limits of repairs for pavement, curb and <br />gutter, driveway configuration, ADA curb ramps, etc. All other improvement pian sheets will be drafted at 40 - <br />scale. <br />Subtesk 5.02 M Specifications. <br />Wilidan will prepare technical special provisions for bid- ® Task 5.02 Deliverables - <br />ding per City standards. The City will provide bollerplato • One electronic PDF copy and one electronic <br />specifications. Special provisions will be prepared utilizing Word Oopy of technical and special provisions <br />Greenback and Caltrans formats (latest editions), at SO- and 100-porosnt completion milestones <br />Subtask 5.03 — IEngineses Construction Cost Estimate. <br />rq <br />Wilidan will prepare a construction cost estimate to accompany Task 5.03 Deliverables <br />®Task 8 Deliverables <br />the 3O•, 60-, and i 00 -portent pian deliverables. Quantity calcula- • One electronic PDF copy and one elec- <br />for Information about the plans and specifications. This <br />tions and final construction cost estimates will be prepared in ac- tronlc Excel copy of engineers cost esti- <br />cordance with City requirements to establish the project budget. mate at concept and 3c-, 60-, and 100- <br />i <br />psrcentocmpletion milestones <br />manager, as appropriate, regarding the requests to ad- <br />Task 0 — Construction Sldding Phase Services • Opti®nA and option 8 <br />` <br />Willdan will prepare a construction bid package per City <br />r <br />standards, Wilidan will advise the Cfty of the appropriate Task 6 Deliverables <br />LJ <br />responses to bidders' technloal questions. if an adden• s Construction bid package <br />work. Up to 10 responses to requests for information are included In the scope. <br />dum is determined appropriate by the City, Wilidan will, • Addenda, as necessary <br />r:s <br />prepare revised plans, specifications, and/or quantity as- • Log of bidder inquiries <br />I <br />timates. Wilidan will provide support during construction bidding phase services and advertising period by: <br />LJ <br />• Attending pre-bid meeting <br />' One complete set of original record drawings on <br />■ Assisting In analysis of bids, as necessary <br />on Mylar. Revisions will be solely based upon <br />• Logging questions and responses to bidders' questions regarding the bid documents <br />Mylar, one electronic PDF copy, and one MI - <br />orostation Vit <br />•issuenztumbld doouments to answerclusstiorrs raiser/ itrsquirt — — --- <br />formation provided by the City's construction <br />Task 7 — Preconstruotion and Job Site Meetings Opf do A and Option Q .k -I <br />°J <br />Wilidan will attend the preconstruotion meeting; job <br />Task ti Deliverables <br />walk, and job -site meetings, as required, over the <br />course of construction. Wiildan assumes one precon• Meeting manures <br />struction meeting and three job site meetings. <br />Task 8 - Respond to Requests for Information and Submlttais - Option A and Option B' <br />rq <br />Wlltdan will provide responses to contractor's requests <br />®Task 8 Deliverables <br />b> <br />for Information about the plans and specifications. This <br />a Log requests for Information and provide responses <br />task includes conferring with the Clty's construction <br />• Field design recommendations <br />, <br />manager, as appropriate, regarding the requests to ad- <br />■Field meeting minutes <br />` <br />dress unforeseen site conditions and/or provide field de- <br />• Design details <br />sign recommendations. Regularly scheduled construction observation is specifically excluded from this scope of <br />work. Up to 10 responses to requests for information are included In the scope. <br />Task 9 - Prepare Record Drawings/As-Bunts - Option A and Option.& <br />Within 60 days following completion and acceptance of <br />ffJ Task 9 Deliverables <br />n <br />the project, Wilidan will furnish the City with a complete <br />set of revised original tracings showing as -built Conditions <br />' One complete set of original record drawings on <br />a <br />on Mylar. Revisions will be solely based upon <br />as -built In- <br />Mylar, one electronic PDF copy, and one MI - <br />orostation Vit <br />formation provided by the City's construction <br />manager and <br />the Contractor, <br />b� <br />Gompre$onstve. rnnovative, Trusted. <br />25E-736 <br />lvl <br />Proposal foron�CallEnglneering ?' <br />RFP No.17-088 L+ <br />