Laserfiche WebLink
.City of9antaAna <br />Relevant project Experience <br />WlUdan has chosen the following representative summaries for completed projects that exemplify Wllldan°s <br />extensive expertise and relation to the Scope of Work detailed In the RFP, <br />Firestone Boulevard Capacity Enhancement <br />C/ty of South .Gate <br />8680 California Avenue <br />.youth Gate, CA 90280 <br />Client Contact- Arturo Cervantes, Public Works Dirac. <br />for <br />($23) XB3 6512 <br />PtraJect Dales: 2025 to 20f7'(desfgn camptefed;n- <br />Willdan is providing civil and traffic engineering de- struction ongoing) <br />sign and other appurtenant services for street Im- Project Team., Tyrone Peter, Bevid Knell, John Hp <br />provements from Alameda Street to Hunt Avenue dalgo, Vanessa Mufioz, MahsenRahimian, Salvador <br />funded through Metro and local funds. The project Is Lopez, Alexis Escobar, Ross Khtabard, Ray Wellington, <br />a complete rehabilitation of roadway Improvements Michael Ovsw, Kenneth Krieger, Randy Shadowen, Bar - <br />that involve widening the street from four to six; reha- nardo Reyes, Susana Bsrrlenfcs, Bryan Nguyen, Sheila <br />bilitating street pavement sections, Including local- McCaWWO, Robert Burch, Chris Stan®, Edward Cote <br />ized removat and repiaosment of failed roadway-, In. Chlophor Su4filroXKKelley, <br />ll a Ryan Maoredo, M inn, Robert <br />stalling landscaped and hardscaped medians, Mclud <br />ing Orougfit=reslstance plants, irrigathm system, and lighting <br />system; reoonstructing deficient sidewalk, curb,.gutter, <br />driveway approaches, and ADA -noncompliant curb ramps; <br />planting street parkway trees without Irrigation, green <br />streets technologies, and cornpletestrsets <br />Artistic elements and gateway corridor entrance are in- <br />cluded in the design. Other Improvements Include bus shel- <br />ters and bus turnouts, traffic signal modifications with bat- <br />tety backup, pedestrian Countdown heads, and upgrades to LEC where possible. Signals will be.synchro- <br />nized to reduce traffic congestion .and improve bus speeds. <br />Los Alamitos Boulevard Median Improvemonts <br />City of Lor Alamitos <br />$191 Katetta.Avenue <br />Los Alamitos, CA 90720 <br />Wilidan provided civil and trafficc engineering and <br />other appurtenant services for street Improvements <br />betweenGordWs Avenue and Katelta Avenue. As <br />one of three Improvement segments, the project In- <br />volves raised medians with landscaping and irriga- <br />tion, hardware, decorative street lights, electrical re-- <br />ceptacies for seasonal tree fighting, tree upiights and <br />monument signs, Median improvements were opts - <br />mined through traffic analysis and vehicle turning <br />movement modeling. <br />Crosswalks at tour signalized Intersections will be re- <br />moved and replaced with Integral colored concrete. A <br />storm drain on Serpentine Drive will be modified. Por- <br />tions of the project limits will receive a 12 -inch -thick <br />full -depth asphalt ooncrete over 9 -Inch -thick com- <br />pacted subgrado. Wilidan assisted the City with public outreach to garner input through town hall meetings, <br />open houses, and public hearings, <br />Client <br />Steven Mendoza, CommunityDovelopment <br />Contact. <br />DireCtor <br />(662) 431.3538 extension 300 <br />Project <br />2016 to 2017 (design completed,• consouc- <br />Datax. <br />tion ongoing) <br />Projoot <br />Tyrone Peter, Dovid Knell, John Hdrtigo, <br />Team: <br />Mohsen Rahimian, Michael Bustos, Randy <br />Shadowen, Bernardo Reyes, Sueana Ber- <br />dentoe, Bryan Nguyen, Sheila McCracken, <br />Robert Burch, Chris Slane, Edward Cox, <br />Kevin Cusfado, Eiroy Kiepke <br />. Comprehensive. innovative• nmtod. <br />25E-737 <br />Proposal for on -Call t?nginoaring. 25 <br />RFP No. 17-W3 <br />