<br />Relevant project Experience
<br />WlUdan has chosen the following representative summaries for completed projects that exemplify Wllldan°s
<br />extensive expertise and relation to the Scope of Work detailed In the RFP,
<br />Firestone Boulevard Capacity Enhancement
<br />C/ty of South .Gate
<br />8680 California Avenue
<br />.youth Gate, CA 90280
<br />Client Contact- Arturo Cervantes, Public Works Dirac.
<br />for
<br />($23) XB3 6512
<br />PtraJect Dales: 2025 to 20f7'(desfgn camptefed;n-
<br />Willdan is providing civil and traffic engineering de- struction ongoing)
<br />sign and other appurtenant services for street Im- Project Team., Tyrone Peter, Bevid Knell, John Hp
<br />provements from Alameda Street to Hunt Avenue dalgo, Vanessa Mufioz, MahsenRahimian, Salvador
<br />funded through Metro and local funds. The project Is Lopez, Alexis Escobar, Ross Khtabard, Ray Wellington,
<br />a complete rehabilitation of roadway Improvements Michael Ovsw, Kenneth Krieger, Randy Shadowen, Bar -
<br />that involve widening the street from four to six; reha- nardo Reyes, Susana Bsrrlenfcs, Bryan Nguyen, Sheila
<br />bilitating street pavement sections, Including local- McCaWWO, Robert Burch, Chris Stan®, Edward Cote
<br />ized removat and repiaosment of failed roadway-, In. Chlophor Su4filroXKKelley,
<br />ll a Ryan Maoredo, M inn, Robert
<br />stalling landscaped and hardscaped medians, Mclud
<br />ing Orougfit=reslstance plants, irrigathm system, and lighting
<br />system; reoonstructing deficient sidewalk, curb,.gutter,
<br />driveway approaches, and ADA -noncompliant curb ramps;
<br />planting street parkway trees without Irrigation, green
<br />streets technologies, and cornpletestrsets
<br />Artistic elements and gateway corridor entrance are in-
<br />cluded in the design. Other Improvements Include bus shel-
<br />ters and bus turnouts, traffic signal modifications with bat-
<br />tety backup, pedestrian Countdown heads, and upgrades to LEC where possible. Signals will be.synchro-
<br />nized to reduce traffic congestion .and improve bus speeds.
<br />Los Alamitos Boulevard Median Improvemonts
<br />City of Lor Alamitos
<br />$191 Katetta.Avenue
<br />Los Alamitos, CA 90720
<br />Wilidan provided civil and trafficc engineering and
<br />other appurtenant services for street Improvements
<br />betweenGordWs Avenue and Katelta Avenue. As
<br />one of three Improvement segments, the project In-
<br />volves raised medians with landscaping and irriga-
<br />tion, hardware, decorative street lights, electrical re--
<br />ceptacies for seasonal tree fighting, tree upiights and
<br />monument signs, Median improvements were opts -
<br />mined through traffic analysis and vehicle turning
<br />movement modeling.
<br />Crosswalks at tour signalized Intersections will be re-
<br />moved and replaced with Integral colored concrete. A
<br />storm drain on Serpentine Drive will be modified. Por-
<br />tions of the project limits will receive a 12 -inch -thick
<br />full -depth asphalt ooncrete over 9 -Inch -thick com-
<br />pacted subgrado. Wilidan assisted the City with public outreach to garner input through town hall meetings,
<br />open houses, and public hearings,
<br />Client
<br />Steven Mendoza, CommunityDovelopment
<br />Contact.
<br />DireCtor
<br />(662) 431.3538 extension 300
<br />Project
<br />2016 to 2017 (design completed,• consouc-
<br />Datax.
<br />tion ongoing)
<br />Projoot
<br />Tyrone Peter, Dovid Knell, John Hdrtigo,
<br />Team:
<br />Mohsen Rahimian, Michael Bustos, Randy
<br />Shadowen, Bernardo Reyes, Sueana Ber-
<br />dentoe, Bryan Nguyen, Sheila McCracken,
<br />Robert Burch, Chris Slane, Edward Cox,
<br />Kevin Cusfado, Eiroy Kiepke
<br />. Comprehensive. innovative• nmtod.
<br />25E-737
<br />Proposal for on -Call t?nginoaring. 25