The scope Included pavement rehabilitation,
<br />recanstruCtiornf rehabilitation of damaged Curb and
<br />quite; cross gutters, sldaw alks, d and driveway
<br />approaches, detailed design modkotions to improve
<br />nuisance flow drainage problems, and providing WCR to
<br />meet ADA requirements,
<br />17th 5treeMstn Avenue and Harbor Boulevard!
<br />Wilson Street intersections improvements,
<br />Costa Mesa, CA (Prot Engineer)
<br />Jeff prepared PS&E for intersection capaaty and aesthetic
<br />improvements at the Oh strodtlTus irtAvenue and
<br />Harbor BoulevardtWilson Steel Intsrsecltons. Project
<br />capacity Improvements at 17th Stmeffusfm Avenue
<br />Included exclusive right -turn lanes on iiia aasihaund and
<br />northbound approaches and a far-sMa burs tum -out on
<br />eastbound 117th Street The impmvemerds also Included
<br />decorative crosswalks across so approaches of the
<br />intersection, newcurb returns and ADA•oampilantaccess
<br />ramps, now sidewalk and tree walls, steed medians
<br />with landscaping and lmfgetion systems, and now street
<br />lighting.
<br />Improvements at Harbor Boulevard and Wilson Street
<br />Intersection induced an exclusive westbound right -turn
<br />lane, including retaining wall destiln. We prepared all
<br />street improvement plans kir these lin facts, including .
<br />roadway pian and profiles, detail sheets, traffic signal
<br />modification, signing and striping, and aboat fighting.
<br />Lakewood/Rosemead Boulevard at Telegraph Road
<br />Impmvements, Downey, CA (Project Engineer)
<br />Jeff helped design and construct street inpmvements and
<br />enhancements at the Lakewood BoulevmdlRmemead
<br />Boulevard Intersection with Telegraph Road. This profit
<br />was funded by the Truck Impacted Intersection Program
<br />Phase 2 through the Gateway Cities CCG and Measure
<br />R funds as part of the M Congestion Hot Spots Study.
<br />It was a joint effort between the cities of Downey and
<br />Pico Rivera combiningthe two funding sources and
<br />completing the improvement of this Intersection as one
<br />comprehensive project This project reconstructed the
<br />Intersection with PCC pavement and widening to ultimate
<br />width to include additional through and tum lanes. The
<br />scope of work was to rehabilitate the roadway pavement
<br />and provide capacity -enhancing improvements. The
<br />pavement rehabilitation will Involve complete pavement
<br />recoriftation utilizing PCC pavementfor the Intersection
<br />and all approaches In all directons.
<br />"nenotesproJacts compNoifivith other firms
<br />I l li '1 i ,e a Fllew � f i1, 1'
<br />Fairview Road and Wilson Street intersection
<br />Improvements, Costa Mase, CA (Project Manager)
<br />Jeff managed the engineering design for ttta roadway
<br />Improvements along Wilson Strut from Columbia Dive
<br />to Newport Boulevard. The project Involved widening
<br />both sides of When Street to provide additional through
<br />lanes in bath directions throughout the project limits,
<br />Services included conceptual planning, final PS&E and
<br />right -of --way, mapping. The scope of the improvaments
<br />Included new asphalt pavement, curb and gutter, sidewalk,
<br />driveways, a bus turnout, ADA -Compliant curb ramps,
<br />drskge improvements, unity relocations, private
<br />property Improvements, signing and strgkrg, and a 1ref is
<br />signal modification. Construction bid documents and an
<br />engineer`s estimate were also prepared. Finally, legal
<br />descriptions, plats, and a programming cost estimate were
<br />prepared for the parcels where right of --way acquisition
<br />that was required for the project improvements.
<br />Newport Boulevard Widening, Newport Beach, CA
<br />(Project Manager)
<br />Jeff managed this project that provided comprehensive
<br />professional services associated with the conceptual
<br />planning, final design and constnrotlon of street
<br />Improvements and landscaping anhimoomends along
<br />Newport Boulevard from 30th Street to Via Lido.
<br />The project Included roadway widening and median
<br />Improvements along Newport Boulevard to add an
<br />additional northbound through Ione between 301h Street
<br />to 32nd Street and an additional southbound through lane
<br />between Vie Lib to 32nd Street Comte bike lens
<br />were constructed along both sides of Newport Boulevard
<br />to provide a connection to the existing bike lanes along
<br />32nd Shot, west of Newport Baelaverd. The project
<br />also included constructing a now pubbic parking lot on
<br />the northwest comer of to Newport Boulevard and 32nd
<br />Street Intersection, which requkanl the demolition of an
<br />existing building. This new public parting lot replaced
<br />the Curbside public parking spares last due to the new
<br />roadway Improvements, The project enhanced the visual
<br />quality of the project area with now landscaping and other
<br />decorative features and improved safety by introducing
<br />raised landscape radians on Newport Boulevard,
<br />25E-805