My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vijay Pampara <br />EIT <br />Civil Design <br />Education . <br />• MS and -BS, Civil Engineering <br />Registrations/Certifications <br />Engineer -In -Training #141201, CA <br />Why select <br />PS&E preparation experience <br />• City of Santa Ana project experience <br />Well versed in and adheres to local city, <br />.: state, and Federal agency processes and <br />guidelines <br />`Denotes projects completed with other 06 <br />Way provides engineering and design services for public and private <br />infrastructure projects throughout Orange County, including the City <br />of Santa Ana, He Is experienced In all design stages, including PS&E <br />package preparation. Additionally, Vijay has worked on numerous <br />Caltrans and Southern California municipal projects, including <br />Interchange reconfiguradon, roadway improvement, cost estimating, <br />and hydrohrgyPoydraullos design. His strengths also include AutoCsd <br />Civil 31), lnRoads, and Micro Station design tools. <br />Santa Ana Cycle Track, Santa Ana, CA (Design Engineer) <br />Vday provided civil engineering design services for this 2.4 -mill <br />separated bikeway within the City of Santa Ana. We provided concept <br />refinements and precise a ignment studies for the protected bike <br />lanes ub[Wng raised medians, landscape improvements, bulb -cuts at <br />designated Intersections, and traffic signal modifications. The design <br />wig complate a one-way cycle track in each direction along Santa Ana <br />Boulevard, 6th and 6th Streets connecting the Santa Ana Regional <br />Transportaft Center to the down town civ center area, -The total <br />project length is approximately 2 miles of one-way cycle track and 0.4 <br />miles of two-way cycle track. <br />CV Unk, Coachella Valley, CA (Design Engineer) <br />Vijay Is providing civil and Mc engineering final PS&E design <br />services t®rtho o"heat segments of ON Link. CV Link is a 50• <br />mile shared use protected path connecting the Coachella Valley <br />communil es from Palm Springs to Coachella. We are working closely <br />with the client and desert communities to design this world-class <br />facility, CV Link is a 3100 million project with nearly all funding in <br />place. <br />Maine Avenue Complete Streets, Baldwin Park, CA <br />(Design Engineer) <br />Vijay Is designing ADA curb ramps, re -designing commercial and <br />residential driveways forADA compliance bulb -outs, and designing <br />the roundabout. A mad diet Is proposed for die Maine Avenue <br />corridor, which will modify die four -lone roadway to provide a three - <br />lane roadway, providing one through lane In each direction and a <br />continuous median or center left tuna lane throughout <br />25E-806 <br />
The URL can be used to link to this page
Your browser does not support the video tag.