Laserfiche WebLink
, , . ..r <br />Ol y Is helping create existing and proposed surface, <br />analyzed and designed the driveways along South $#ad <br />lo, acquire minimum right of way for the new sidewalks. He <br />designed ADA curb ramps and created crass sections and <br />details for Individual parcels per City standards. <br />Redondo Beach Cycle Track, Redondo Beach, CA <br />(Civil Engineering Task Lead) <br />Vijay provided design engineering services for the <br />preparation of plans and estimates for proposed bicycle <br />fdarxlly facBUes along two important roadways within <br />Redondo Beach's Marina district, He provided conceptual <br />roundabout design geometries that was presented In <br />public meetings as one of the project alternatives. <br />Hazard Avenue Corridor Bikeway Improvement <br />Project, Grange County, CA (Design Engineer) <br />Vjay provided engineering design services for a Class IV <br />bikewayalong the Hazard Avenue Corridor through the <br />ehlos of Huntington gton Beach east to Santa Ana. The corridor <br />Improvement begins near the intersection of Boisa Chico <br />Street lir the City of Westminster and extends east to the <br />SantaAna River in the City of Santa Ana, a distanoe of <br />approximately 14 miles. The project Included a traffic study <br />to address the proposed'road dot and convert traffic <br />lanes to Class IV on -street protected bide lanes. <br />South Street Gap Closure, Anaheim, CA <br />(Design Engineer) <br />Vjay helped create existing and proposed surface, <br />analyzed and designed the driveways along South Street <br />to acquire minimum right of way for the new sidewalks. <br />He designed ADA cuff ramps and created cross sections <br />and details for Individual parcels per the City of Anaheim <br />Standards. <br />Camino did Rio Roundabouts, San Clemente, CA <br />(Project Engineer) <br />Vijay assisted with the design for the earlier project <br />phases and assisled with final design plans for two large <br />roundabouts and other street improvements. The Qty <br />needed to address the potential for rising traffic volumes <br />along Camino de Los Mares and Camino dei Rio due <br />to Imminent completion of a new regional arterial link. <br />Neighbors were concerned about Increasing traftir <br />volumes and sought Improvements that would improve <br />the neighborhood. The roundabout solution proved to be <br />w4recetved in addressing future traffic volume, speeding, <br />and safety Issues, We proceeded to provide full design <br />services fortho roundabouts, including drought -tolerant <br />landscaping that is appropriate to the neighborhood and <br />Improved circulation for pedestrians and bioyclicts, <br />• Denotes projects completed with other rims <br />OC Great Park Sports Park, Irvine, CA <br />(Design Engineer) <br />Vijay Is providing civil engineering design services for <br />the sport park's development and design, which Includes <br />175 now of recreational spats and fully compliant <br />accessible site access. We are designing the precise <br />grading, drainage, sewer and water, and traffic facilities. <br />Weare providing construction support services through <br />cornplsiion. <br />1.05 Sepulveda Pass widenfng*, Los Angeles, CA <br />(Design Engineer) <br />VIjoy designed and prepared conustruction documents, <br />prepared mastertraffic signs tmpaot document far the <br />entire corridor during the bld preparation phaco, and <br />coordinated with various disciplines to hep enure smooth <br />and tfy project delivery, The project included widening <br />and maligning 20 misting on and off -ramps, removing <br />and replacing 3 bridge overcrossing structures, widening <br />14 malillne freeway under crossings, and replacing <br />0 ramp bridges. Key challenges included installing 18 <br />miles of retaining and sound wells and performing road <br />Improvements on adjacent city streets. <br />SR -91155157 PSR, Irvine, CA (Design Engineer) <br />Vijay is helping preparing PSRPDS, develop alternatives, <br />detailed cost esthnate, alternative schematics, typical <br />cross sections, preliminary layouts, right of way acquisition <br />exhibit& This study also explores continued improvements <br />for the SR -55 and SR -91 freeway Interchange complex, as <br />well as evaluation of overall road capacity needs between <br />the two major interchanges. Improvements to the SR -91 <br />corridor and tha Interchanges will alleviate congestion <br />and accommodate the needs for mobility, amass, goods <br />nrovematd, and future tragic demands, <br />25E-807 <br />