My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TAIT & Associates, Inc. <br />On -Call Engineering services <br />0 wwm� <br />Improvements for a 36.S-acre retail center. Because of downstream storm water concerns the site was <br />design to capture and Infiltration over 9%cif the projeces on -site storm water runciff with multilple <br />small basins along the perimeter, a 1000-foot long linear basin along the project's western boundary <br />and a 3-acre basin capable of dewining andinfiltrating a 100-year storm event, The Site Improvements <br />also included a half -mile of d ry utility distribution services undergrounding and new Installation along <br />the project's perimeter. The Project's Parcel Map also included the dedication of roadway right of way <br />for the widening of Avenue L and 670th Street west and the construction of Avenue K-12 (a now public <br />street), <br />Harbor Boulevard Street Reconfiguration, Water Main Replacement & Utility Relocations, City of <br />Garden Grove, Senior Project Manager, 2013 <br />Project Manager of the work being conducted by all TAIT staff to provide Design Engineering Service for <br />then $SOD K water main replacement and utility relocation project and the $ 1 M Street Reconfiguration . <br />Project In the City of Garden Grove. Primary responsibilities were to reviewarid stamp the plans, <br />supervise engineering team, and attend and coordinate project meetings with Citystaff and other <br />stakeholders, Project hTcluded Providing Plans Specifications and Cost estimate for City Improvements to <br />Harbor Boulevard that will accommodate the future. redevelopment of several city -owned parcels. This <br />project IncJuded rewrifiguration of Harbor Boulevard from Palm Street to tampsor�.Avenue <br />(approximately 1/3-mile total length), Improvements to an existing raised median, abandonment of <br />existing &-Inch ACP and 12-Inch DIP City water lines, Installation of a 800 LF of new-16-Inch water line, <br />relocation of SCE arid AT&T main d1strIbution service lines, and the installation of new public storm <br />drains, sewer and water services, <br />A -Town Street Widening and Sewer Capacity Improvements, City of Anaheim, Sr. Project Manager, 2007 <br />Engineering design.services Included the design of sewer capacity enhancements for over 2 miles on <br />new.15-Inch and 21-Inch sewer lines in Katella Ave., Gene Autry Way and Santa Cruz Rd. in the City's <br />PlatinumTrIangle area. Encroachment permits were obtained from the Orange County Sanitation <br />District for connections to a district sewer line and with Caltrans District 12 (Orange County) for work <br />within Interstate 1-5 right of way, The engineering design services also Included the preparation street <br />widening plans for Katella Avenue, State College Boulevard and Gene Autry Way (approximately one - <br />mile) that Included a new raised landscape median In Katella Avenue, and the reconstruction of a City <br />Changeable Message Sign. <br />Abridged List of Additional Project Experience by Todd: <br />Quadrant III Water Line Replacements, City of Chino, QA/QC Manager <br />Tustin Metrolink Station Redevelopment, City of Tustin/OCTA, Sr, Project Manager <br />Red Hill Median & Streetscape Feasibility Study, City of Tustin, Sr. Project Manager <br />> County Regional Park, OC Parks, City of Tustin, Sr. Project Manager <br />> Yorba Linda Water District Sewer Main Replacement, Yorba Linda, CA <br />> Normandle Avenue Water Line Replacement Project, Golden State Water Company <br />> Antonio Parkway Widening Improvements, County of Orange <br />I i Appendix I Page 4 <br />5E-583 <br />
The URL can be used to link to this page
Your browser does not support the video tag.