Laserfiche WebLink
TAIT & Associates, Inc. <br />On -Call Engineering Services <br />Irvine Center Drive Rehabilitation Project — City of Irvine, Project Engineer, 2009 <br />David served as Project Engineer, providing design engi neering a nd construction support services to <br />rehabilitate 1.5 miles of this 6 lone arterial and major thoroughfare In Irvine. The project spanned Irvine <br />Center Drive, from Jeffrey Road to Culver Drive, and the design phase Included stretches of full depth <br />reconstruction combined with a grind and overlay of the entire roadway, 6,300 SF of sidewalk, 15�80D LF <br />of median curb, 136 traffic loops, 30,ODO SF Of landscaping and Irrigation, and upgrading ramps to meet <br />ADA compliance. Along with the design, David alto provided Construction Support Services, Including <br />responding to RFI's, attending meetings, providing assistance related to Change Orders, and reviewing <br />Contractor's submittals for conformeince with contract documents. David alsoi prepared As-Bullt <br />documentation, <br />STPL Woodruff Ave. & Palo Verde Ave. Rehab. Project, City of Beliflower, Project Engineer, 2013 <br />As Project Engineer, David provided Design engineering and Federal Aid Docomentation services to the <br />City of Bellflower for this STPL-funded project The project spanned 5,200 LF of arterial roadway, along <br />Woodruff Avenue, from Alondra Boulevard to Somerset Boulevard and Palo Verdes Avenue, from the <br />South City Limits to Artesia Boulevard, The project was designed as atingle project, but split for <br />construction, The scope included full -width grind and ARHM overlay, localized full -depth <br />reconstruction, PCC sidewalk, curb & gutter, driveway, Installing 16 ADA-corripliont curb ramps, as well <br />as extensive traffic control to allow accessto open businesses during cQnstr6ctIon, Davidpreparecianii- <br />76 Construction Authorization Package to obtain Caltrans approval on the project and to secure funding. <br />David continued to coordinate with Caltrans for the duration of this contract. <br />STPL Bellflower Blvd. & Woodruff Ave. Rehabilitation, City of seliflower, Project Engineer, 2011 <br />a A <br />Phase I & 2 Water Main Replacement,Project, City of Norwalk, Project Engineer, 2010 <br />Davidserved asProject Engineer for the City of Norwalkon Phase 1&Phase 2 of thiswatermaln <br />replacement project. Phase I spanned from Atondra Boulevard to 166th Street, and various other <br />streets, and Included the Installation of 4,512 LF of 8-Inch DIP pipe, 27 gate valves, 125 new house <br />meters with re -connections, and the repaving and capping of all excavated areas. Phase 2 Included <br />6,200 LF of B-I rich DIP Water main replacement between Elmhurst Drive and Harvard Delve, and Gridley <br />Road and Gard Avenue, David was also responsible for analyzing fire hydrant spacing to ensure <br />adequate fire water coverage was available at all residential and commercial blocks. All phases of the <br />water main replacement project were designed to fit the City's CIP funding needs. <br />Abridged List of Additional Project Experience by David. <br />> Pier P-G Sewer Improvement Project,Port of Long Beach, Project Manager <br />> STPL Bellflower Blvd. & Woodruff Ave. Rehabilitation, City of Bellflower, project Engineer <br />>, SRTS; Campus Drive Class I Blkeway Project, City of Irvine, Project Engineer <br />> Citywide Comprehensive Drainage Study, Diamond Bar, Project Manager <br />> PTA -Administrated 2010 Bus Shelter Replacement Project — Norwalk Transit, Project Engineer <br />> Area 2 & Zone I Roadway Maintenance Project, City of Diamond Bar, Project Engineer <br />> Berry Street & Imperial Highway Sewer Main Replacement Project, City of Brea, Project Engineer <br />Appendix I Page 7 <br />TAIT <br />25E-586 <br />