Laserfiche WebLink
I <br />PROPOSAL ON -CALL ENGINEERING SERVICES <br />RFP NO.: 17-083 <br />City of Santa Aria <br />RAVI SHA", PE, Q8D/P <br />Ravi has -,Moro than TO years of experience providing project Mainagornent-experow in the design of highway <br />and loW IntrostIoucture IM I <br />provemonts. Manegin' a ptojeds., Wading toams and building <br />ov? tiumorous 0 multerwou <br />consensus are o few of the many strengths has developed as a project erniilneer� Rov) Is well versed at <br />managing Iolill-pac0d. multiagoncy/dIscipline pr*cW. <br />REPRESENTATIVE PROJECTS <br />0600t ROLE <br />CKfiltoadway Udd <br />N-rilqna <br />DRIVE IMPROVEMENTS PROJECT, NEW i PORT BEACH$ <br />)mlnagodeolgneilg,liie�.rf�T,ftim vementprojectInNewip <br />pro I <br />*k Thomas Is providing enalneefing. gornistdr-and1roinsportat <br />.. and 6Verall vehidular and btultimodal <br />Ahs 4"val end peftfiffirviii, pavement <br />design, and bikWpod improvements. <br />WARNER AVENUE WIDENING AND <br />Project angliteerfor the linal PSU to w <br />Avenue from Main Streetto Oak Street ' <br />from a four fans undivided atierialJor os <br />the 04 and County arterials mater P% <br />jeeparated Typo IV blka. lone which will a <br />focillfies including the paoilictiactric, Bit <br />development of cross sedition afterriii0t <br />improvements. <br />ROVBMENTS, SANTA ANA, CA <br />overl,800 flnew feat4of Warner <br />praIect will convert.the romilway <br />ie divided arterial to contbim to <br />a six lone arterial includes curb <br />to connect two `[Voei bike lane <br />and drainage <br />US 101 HOV & REHABILITATION PROJECTS, SANTA BARBARA, CA <br />Project engineer responsible for preliminary design services to evaluate <br />geometrics for $300M, 4.&mIle HOV widening and pavement rehabilitation <br />projects. Project alarifents jalso include reconstruction of-tw� Interchanges with <br />left -lane off -ramps, replacement of t " hiree bridges of FgMA-requiated creeks, <br />retaining wafts along the sea olff, sound wafts, and pavement rehabilitation. <br />SR 68 (ROSEDALE HIGHWAY) WIDENING AND IMPROVEMENTS <br />PROJECT, BAKERSFIELD, CA <br />Project engineer responsible for overseeing the coordination and reloodflon of <br />Impacted utilities and tho design of stage construction plan sheets for widening <br />approAmately 6.6 miles of SR 58/Rosedale Highway ftom SR 99 to Allen Road. <br />The project Will add. one lane In each direction, median Improvements, and turn <br />lanes at certain Intersections. <br />STATE COLLEGE BOULSVA <br />PROJECT, FULLERTON, OA <br />Construction support for the do <br />preparation of final PS&r- for cc <br />and profiles, and hydrology and <br />railroad bridge, special design n <br />modifications, parking lot site Im <br />coordination, and survey and rk <br />RAILROAD GRADE SEPARATION <br />)pment of the grade separation design, <br />suction. drainage design, drainage plans <br />draulk; calculations, The project Includes a <br />InIng wags, pump station, signal and fighting <br />wernents, water and sewer relocations, utility <br />of way support. <br />25E-646 <br />