Laserfiche WebLink
.City of Slarift Ana <br />Relevant project Experience <br />Wilklan has chosen the following representative summaries for completed projects that exornplify 01111dan's <br />extensive expertise and relation to the Scope of Work detailed In the RFR <br />Firestone Boulevard Capacity Onhancement <br />Qfy of South Gata, <br />8660 Calffornia Avenue <br />South Gate, CA 90280 <br />Wilklan Is providing civil and traffic engineering de- <br />sign and other appurtenant services for street Im- <br />provemants from Alameda Street to Hunt Avenue <br />funded through Metro and local funds, The project It <br />a complete rehabilitation of roadway Improvements <br />that Involve widening the street from four to six; reha- <br />bilitatIng street pavement sections, Including local- <br />Ized romovat and replacement of failed roadway-, In. <br />stalling landscaped and hadscaped medians, Includ, <br />Client Contact- Arturo Cervantes, Public Worb Dirac. <br />tor <br />($23) <br />na#­ <br />struction ongoing) <br />PrOjeot Team., Tyrone Peter, Be vid Kne#, John HP <br />fto Vanessa Mufioz Wean Rahimian Salvador <br />LOOZ, Alexis Escobar, Ross 1(thebant Ray Wellington, <br />Michael Ovsw, Kenneth Krieger, Rar* Shadowen, Bar- <br />nardo Reyes, Susana Sarr%egics, &Yen Nguyen, Sheila <br />McCAWWO, Robert Burch, Chris Stand, Edward 0ox, <br />Ch4lopher Kelley, Kevin Castado, . Nko#o Spann, Robert <br />Son, filroy KlepkeRvan Moore <br />Ing Orougfit*resistance plants, Irrigation system, and lighting <br />system; r000nstructinp deffelent sidewalk, curb, -guttor, <br />driveway approaches, and ADA-noncompliant curb ramps; <br />planting street parkway tress without Irrigation, green <br />streets technologies., and oompletestreets <br />Artistic elements and gateway corridor entrance are fn� <br />cluded In the dsslgn. Other Improvements Include bus ehel- <br />ters and bus turnouts, traffic signal modifications wim net- <br />tety backup, pedestrian countdown heads, and upgrades to LED where possible. Signals will be synchro. <br />nized to reduce traffic congestion.and Improve bus speeds. <br />Los Alamitos Boulevard Median Improvemonts <br />City of Los Alamitos <br />$191 Kate& Avenue <br />Los Alamitos, CA 90720 <br />Wilklan provided civil and traffic engineering and <br />other appurtenant services for street Improvements <br />between 0ordWs Avenue and Katellat Avenue. As <br />one of three Improvement segments, the project In- <br />volves raised medians with landscaping and Irriga- <br />tion, hardware, decorative street lights, electrical re'- <br />ceptacles for seasonal tree lighting, tree uplights and <br />monument signs, Median Improvements were opfl- <br />mized through traffic analysis and vehicle turning <br />movement modeling. <br />Crosswalks at tout signalized Intersections will be re- <br />moved and replaced with Integral colored concrete. A <br />storm dfain on Serpentine Drive will be modified, Por- <br />tions of the project limits will receive a 12-inch-thick <br />lull -depth asphalt ooncrett� over 8-Inch-thick com- <br />pacted subgrade. WIlklan assisted the City with public outreach to garner input through town hall meetings, <br />open houses, and public hearings, <br />Client <br />Steven Mendoza, Community Do velopment <br />Contact. <br />DireCtor <br />(662) 431-3538 extension 300 <br />Project <br />2016 to 2017 (design completod, consouc- <br />Datax. <br />00V 00901nq) <br />Proloot <br />Tyrone Peter, Do vid Knoll, John HW/m <br />Team: <br />Ublisen Rahlimian, Michael Buslos, �ranny <br />Shadowen, Bernardo Reyes, Sueana Ber- <br />dentoe, Bryan Nguyen, Sheila MaCiracken, <br />Robett Ovmh, Chris Slane, Edward Cox, <br />Kevin Cuslado, iFiroyfflepke <br />Comprehensive. Innovative. nmtad. <br />R01306t1l t0f On -Call (Zng1no0ring, 25 <br />RFP No. 17-W3 <br />25E-737 <br />