|
.City of Slarift Ana
<br />Relevant project Experience
<br />Wilklan has chosen the following representative summaries for completed projects that exornplify 01111dan's
<br />extensive expertise and relation to the Scope of Work detailed In the RFR
<br />Firestone Boulevard Capacity Onhancement
<br />Qfy of South Gata,
<br />8660 Calffornia Avenue
<br />South Gate, CA 90280
<br />Wilklan Is providing civil and traffic engineering de-
<br />sign and other appurtenant services for street Im-
<br />provemants from Alameda Street to Hunt Avenue
<br />funded through Metro and local funds, The project It
<br />a complete rehabilitation of roadway Improvements
<br />that Involve widening the street from four to six; reha-
<br />bilitatIng street pavement sections, Including local-
<br />Ized romovat and replacement of failed roadway-, In.
<br />stalling landscaped and hadscaped medians, Includ,
<br />Client Contact- Arturo Cervantes, Public Worb Dirac.
<br />tor
<br />($23)
<br />na#
<br />struction ongoing)
<br />PrOjeot Team., Tyrone Peter, Be vid Kne#, John HP
<br />fto Vanessa Mufioz Wean Rahimian Salvador
<br />LOOZ, Alexis Escobar, Ross 1(thebant Ray Wellington,
<br />Michael Ovsw, Kenneth Krieger, Rar* Shadowen, Bar-
<br />nardo Reyes, Susana Sarr%egics, &Yen Nguyen, Sheila
<br />McCAWWO, Robert Burch, Chris Stand, Edward 0ox,
<br />Ch4lopher Kelley, Kevin Castado, . Nko#o Spann, Robert
<br />Son, filroy KlepkeRvan Moore
<br />Ing Orougfit*resistance plants, Irrigation system, and lighting
<br />system; r000nstructinp deffelent sidewalk, curb, -guttor,
<br />driveway approaches, and ADA-noncompliant curb ramps;
<br />planting street parkway tress without Irrigation, green
<br />streets technologies., and oompletestreets
<br />Artistic elements and gateway corridor entrance are fn�
<br />cluded In the dsslgn. Other Improvements Include bus ehel-
<br />ters and bus turnouts, traffic signal modifications wim net-
<br />tety backup, pedestrian countdown heads, and upgrades to LED where possible. Signals will be synchro.
<br />nized to reduce traffic congestion.and Improve bus speeds.
<br />Los Alamitos Boulevard Median Improvemonts
<br />City of Los Alamitos
<br />$191 Kate& Avenue
<br />Los Alamitos, CA 90720
<br />Wilklan provided civil and traffic engineering and
<br />other appurtenant services for street Improvements
<br />between 0ordWs Avenue and Katellat Avenue. As
<br />one of three Improvement segments, the project In-
<br />volves raised medians with landscaping and Irriga-
<br />tion, hardware, decorative street lights, electrical re'-
<br />ceptacles for seasonal tree lighting, tree uplights and
<br />monument signs, Median Improvements were opfl-
<br />mized through traffic analysis and vehicle turning
<br />movement modeling.
<br />Crosswalks at tout signalized Intersections will be re-
<br />moved and replaced with Integral colored concrete. A
<br />storm dfain on Serpentine Drive will be modified, Por-
<br />tions of the project limits will receive a 12-inch-thick
<br />lull -depth asphalt ooncrett� over 8-Inch-thick com-
<br />pacted subgrade. WIlklan assisted the City with public outreach to garner input through town hall meetings,
<br />open houses, and public hearings,
<br />Client
<br />Steven Mendoza, Community Do velopment
<br />Contact.
<br />DireCtor
<br />(662) 431-3538 extension 300
<br />Project
<br />2016 to 2017 (design completod, consouc-
<br />Datax.
<br />00V 00901nq)
<br />Proloot
<br />Tyrone Peter, Do vid Knoll, John HW/m
<br />Team:
<br />Ublisen Rahlimian, Michael Buslos, �ranny
<br />Shadowen, Bernardo Reyes, Sueana Ber-
<br />dentoe, Bryan Nguyen, Sheila MaCiracken,
<br />Robett Ovmh, Chris Slane, Edward Cox,
<br />Kevin Cuslado, iFiroyfflepke
<br />Comprehensive. Innovative. nmtad.
<br />R01306t1l t0f On -Call (Zng1no0ring, 25
<br />RFP No. 17-W3
<br />25E-737
<br />
|