Laserfiche WebLink
INTERNAL SERVICE FUNDS <br />FINANCE & MANAGEMENT SERVICES PROGRAM <br />Building Maintenance - Facilities 07310100 <br />Statement of Purpose ' <br />To maintain safe, secure, attractive, and energy-efficient City faciflties and infrastructure (assets) through preventive <br />maintenance (PM), certifications, energy management, and custodial services. <br />This program is responsible for maintaining over one million square feet that covets 38 city buildings including City Hall and the <br />Police Holding & Administration Facility. Asset Management is accomplished through an extensive preventive maintenance <br />program, which increases the life cycle of the asset while reducing repair and replacement costs. The program also manages <br />janitorial services (both in-house and contracmal) needed to keep city facilities at a high standard of appearance and cleanliness. <br />Accomplishments in. FY 2017.2018 <br />• Replaced 3rd floor domestic water supply to inmate area of Police Holding Facility (AMES Plan). <br />• Main Library - Replaced all stair treads. <br />• Santa Anita Center - Replaced all entry doors for ADA compliance and security. <br />• Council Chambers - ADA improvements in public seating area. <br />• SCE OBF funded Project - LED lighting retrofit at PAAL Center. <br />• Obtained proposals and contracted for temporary roof repair for Fleet "J" Building. <br />• Replaced Heat Bundle at the Main Library to restore interior heating. <br />• Reinsulated Main Library chilled water pipes in basement to address a mold concern. <br />• Replaced failed steam trap serving City Hall heating system. - <br />• SARTC's air handler project completed. <br />• SARTC's boiler replacement completed. <br />• Initiated LED light upgrade at SARTC in phases to better manage costs. <br />• Installed screening in Plaza of the Flags parking structure per Interim City Manager. <br />• City Hall restroom faucet and angle stop upgraded. <br />• Relocated homeless article storage containers at Yard and fenced area to improve foot traffic safety and yard security. <br />• Replaced Council Chambers restroom exhaust system. <br />• Replaced Ross Annex can lights with LED - Phase 1. <br />• Designed and coordinated Council Chamber exterior public projection system. <br />• Replaced Santa Anita roof and replaced TI - I l exterior siding. <br />Action Plan for FY 2018-2019 `- <br />• Main Library — automate entry doors and comply with ADA regulations. <br />• Install fall protection on City Hall elevator penthouses (2 total). <br />• City Hall Bridge area—Replace expansion joint. <br />• City Hall — Water seal South side of high rise. <br />• SAPD — Replace 911, and walk in Freezer condensers. <br />• Council Chambers — develop plans to provide separate, secured, and ADA compliant restrooms for Council and the Public. <br />• SCE OBF funded Project — LED lighting retrofit at Corporate Yard. <br />• SCE OBF funded Project — LED lighting retrofit at SAPD. <br />• SCE Pilot Program—Lighting and HVAC control energy measures. <br />• Contract washing of exterior windows at City Hall, Police Department, and Main Library. <br />• Energy Measures — Seek opportunities to install Photovoltaic for: City Hall, Superblock, SARTC, SAPD, City owned <br />Parking Structures <br />• Seek HVAC optimization measures at the Police Department. <br />• Continue to provide maintenance and repair for Grand Central Art Studio, PW -Train Station. <br />Actual <br />Actual <br />Estimated <br />Objective <br />PERFORMANCE MEASURES <br />FY 15.16 <br />FY 16.17 <br />FY 17.18 <br />FY 18-19 <br />Service Level <br />Total square footage maintained <br />1,229,867 <br />1,229,867 <br />1,229,867 <br />1,229,867 <br />Number of Facility Maintenance Work Orders <br />1,352 <br />1,352 <br />2,692 <br />2,700 <br />Efficiency <br />Square feet maintained per Technician <br />City of Santa Ana <br />123,733 <br />123,733 <br />111,806 <br />111,806 <br />Industry Average <br />65,000 <br />65,000 <br />65,000 <br />65,000 <br />Effectiveness <br />%of Work Orders (Preventive Maintenance) <br />98% <br />98% <br />100% <br />100% <br />completed within 7 working days <br />3-6 <br />