My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HUITT-ZOLLARS, INC.
Clerk
>
Contracts / Agreements
>
H
>
HUITT-ZOLLARS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2020 5:24:44 PM
Creation date
7/17/2018 3:57:34 PM
Metadata
Fields
Template:
Contracts
Company Name
HUITT-ZOLLARS, INC.
Contract #
A-2018-160-03
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
9/1/2021
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
We will design the project in accordance with your schedule. This begins with development of a detailed schedule that includes critical <br />path, agency review times, and milestones. Progress will be reviewed during our design meetings. <br />We will design a project that is within your budget. We will develop a project budget that includes contingency, probable construction cost, <br />and consultant fees. The probable construction cost will be prepared using current unit prices and submitted for review. <br />We strive to minimize non -client Initiated change orders during construction. Our QA/QC procedure implements a constructability <br />reviewer. It helps us foresee and resolve potential issues before the bidding phase. <br />Our PM will establish the framework and ensure that we capture your expectations for quality prior to publishing our plan. <br />Existing Utility Inventory- Every project presents Its own special design challenges. The most frequent challenge related to existing utilities <br />we would expect in the City of Santa Ana. Is that improvement to utilities located In developed areas will generally affect or be affected by other <br />utilities. Through experience we have learned that existing records may be non-existent, inaccurate, or lack information. This is why all projects <br />require an effective existing utility locating approach. A precise utility inventory will: <br />e Equal a high quality design <br />» Avoid conflicts during construction <br />v Prevent utility interruptions <br />■ Promote public safety <br />x Avoid construction change orders <br />v Prevent construction delays <br />With RZ, utilities will be located, verified, and compiled Into a 1181 CARD file using a "Four Tier Approach! <br />Envlranmeata►Assessarent-Our assumption for both project options is that the work limits are within areas with existing Infrastructure. Small <br />Improvements of this nature typically qualify for environmental exclusions but if the work requires a negative declaration. Our first step would be to <br />research existing onvimomentallBigg(s). Thereafter our consultant and civil team would assist the City of Santa Ana with supporting studies and <br />documentation to comply with CEQA and/or NEPA. We have assumed exclusions have been filed for both options A and B. <br />ropogrephy- HZ is leading the industry with fixed wing aerial drone surveying. The new technology has a perfect platform in topography. With <br />on board RTK the data will generate an accuracy that matches conventional aerial photography but a picture quality that is unmatched. It allows <br />for quicker delivery and data control at a competitive fee. The data would be supplemented with a field survey(s) and tied to the most appropriate <br />datum. HZ will acquire necessary permits to perform aerial surveys via drones. Our survey department would also provide legal descriptions, if <br />required. Providing plans, specifications, and estimates (PS&E) for engineering projects is the backbone of our Irvine branch. We are familiar with <br />local, state, and federal codes and regulations. This ensures that the design is in conformance with established guidelines. We are also experience <br />with preparation of special provisions. We have been serving Southern California for over 30 years this includes projects with the City of Santa Ana. <br />We are familiar with the City's criteria for acceptance of plans. <br />Encroachment—Potential encroachments would be Identified in the proposal stage. The work to coordinate, design, provide temporary easements, <br />etc. would be included in the fee proposal. Our goal during design is to make every attempt possible to avoid Impact to adjacent properties but it <br />is not always possible. With options A and B we have assumed that all work will fall within City controlled property and that encroachment is not <br />necessary. <br />Water Well Expertise — Our proposed project team has a history of successfully delivering water well design services. Our Bakersfield National <br />Cemetery Project constructed a water well for domestic and irrigation use. Our proposed PM, Mr. Hernandez, rehabilitated several water wells that <br />were used for construction water. The same water wells were later used to feed a cooling system for the Mojave Solar Project, <br />Hul"1 1'G>`J MS City of Santa Ana Civil Engineering Services: RFP 17-083 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.