My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HUITT-ZOLLARS, INC.
Clerk
>
Contracts / Agreements
>
H
>
HUITT-ZOLLARS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2020 5:24:44 PM
Creation date
7/17/2018 3:57:34 PM
Metadata
Fields
Template:
Contracts
Company Name
HUITT-ZOLLARS, INC.
Contract #
A-2018-160-03
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
9/1/2021
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l <br />t/dAty SetWoes — Our project experience offers many projects with sewer, water, and storm droln design. We have also provided dry utilities <br />coordination. We are currently working on projects that install and/orretmfit utilities. <br />Roadway Design Specialists— Our project team has provided roadway design services for urban, rural, primary, secondary, and major roadways. We <br />ars equipped to address all option B aspects Including; <br />Conceptual Design Alternatives • Storm Water Management <br />• Utilitymlocations/adjustments • Rehabilitation <br />a Parkway Landscaping • Final Design PS&E packages <br />• Sound Wall and Retaining Wells • Bike path <br />x <br />• Drainage <br />ltaWle Engineering—We offer complete traffic engineering services, HZ has completed hundreds of traffic engineering projects, Our traffic <br />engineering staff are experts is all aspects of traffic engineering and operations. This Includes; <br />Signing and Striping • Bicycle Safety <br />• Temporary Traffic Control * Parking, access, and circulation <br />School zones + Traffic Calming Plans <br />• Pedestrian Safety <br />katdc Control —Option B would include signing and striping for proposed improvements. The signing and striping would considerthe proposed <br />bike path, Both proleotwill require temporary traffic control during construction. Temporarytraffle control could be deferred to construction phase <br />or it could be included with construction documents. <br />gydrorogyandHydraallcsAnalysls—Option B would include a hydrology and hydraulics analysis that assess drainage Improvements. <br />Water #no*Compliance <br />WQMP-- In accordance with MS4 Permit Guidelines <br />SWPPP- Prepares PRDs in accordance with the requirements set forth In the NPDES General Permit for Storm Water Discharges Associated with <br />Construction and Land Disturbance Activities. The SWPPP may also be deferred to the construction phase. <br />Ceotecholeal gecommendatlons —Our consultant will provide the required analysis to determine the street section thickness, sub -surface soils <br />classification and condition, evaluate soil properties, provide geoteoh nical parameters, trench stability requirements, and backfill recommendations. <br />We will coordinate with the City to make sure quality and durability are not compromised. <br />Estimates— HZ will generate quantity takeoffs and an opinion of probable construction cost for proposed project improvements, Cost estimates <br />shall include construction, engineering, Inspcotion, administration, right-of-way, and contingency. The estimate shall tie the unit price to a cost <br />Index and provide a format that is easily updated or revisod. Bid prices from recent city project shall be reviewed to vedfy unit prices. <br />i <br />! Speolgcalloas—HZ will utilize the City of Santa Ana standard bid specifications and edit them to fit both pmjoct requlrements. This will include a <br />bid sheet showing the anticipated project quantities. <br />Constroctlen Administration Saftes <br />1. Bid Support—Assist City with bid documents, attend bid meeting, and provide bid support. <br />2. Construction Support—Attend pre -construction meeting, provide ongoing support, and attend construction meetings as required. <br />3. Project Close Out — Utilize contractor redlines for as -built plans to prepare record plans In Micro -Station V81 CADD and pdf format. <br />Client SsNsfact/on— Hultt-Zollars achieves client satisfaction by dedicating a concise and experience team that will deliver on schedule and <br />within budget. A key component is affactivecommuulcatlon that begins with listeningto the City's ideas, concerns, and goals. Our status reports <br />summarize discussions, provide follow up action items and set dates for follow up Items. We will create a projeckwork plan that includes that <br />includes all critical tasks to deliver a design that meets expectations. We will Integrate ourselves via meetings, emails, and conversations so that <br />we become an extension of the City's vision for the project. We will attend community meeting to help gain acceptance. <br />HuITT:DUARS City of Santa Ana Civil EngineeringSaroices, RFP 17-083 B <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.