My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
STANTEC
Clerk
>
Contracts / Agreements
>
S
>
STANTEC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2019 11:30:31 AM
Creation date
7/20/2018 12:23:28 PM
Metadata
Fields
Template:
Contracts
Company Name
STANTEC
Contract #
A-2018-159-09
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
10/1/2019
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Services <br />Project Management, Coordination, and QAIQC <br />We will schedule a kick-off meeting with the City staff and <br />other stakeholders to discuss the Project Plan, including the <br />scope of services and schedule, as well as outline <br />immediate tasks to commence, Our key team members will <br />attend. We will discuss QA and QC procedures we will <br />Implement. Clear Imes of communication between the City <br />and our team members will be established. Meeting <br />frequency and attendees will also be verified. for the <br />purpose of this proposal, we have assumed one client <br />meeting per month. <br />Research and field Review <br />Immediately upon notice to proceed, we will obtain all <br />relevant documents from the City (end County, If needed) <br />and review project constraints. All existing utilities will be <br />researched and identified and as -built plans will be used <br />when available for locating substructures. VVe will conduct a <br />thorough project site Inspection to verify plan Information <br />obtained in our research, Information and looatlon of existing <br />utilities will be Incorporated Into the plans as a part of the <br />bass map preparation. <br />EN 1WY '\1✓ ) 01 12 <br />CA <br />1 41-I11 I i �' TIC' <br />L�.•••••��XIfCNN-) fB N-�• ry' tC SUFF1 Wt P Sq <br />VNE <br />B%19tINtl RIpBWALK ^ ^ `\\ pr]NO PAVEMENT ^ ROM <br />U918YWO PARKWAY ROPOM <br />VXIBTIN004 MILE ONE SIREET reRQSS SECTION .PROPaotloct <br />OPTION 1: ONE—WAY CYCLE TFZK (CLASS IV) nnis¢c MeC° asoR <br />wrnFmr vAsrew.v <br />BM' <br />FRI/W <br />CA <br />C' 1 4.I y' I ._..I 1 1� a <br />uNe VRE iuy " w mmm u e w( ri a w <br />y I ;° <br />exwnN B M.K� / ' ^ � �KIBTINO PAVEMW tt <br />RMI®TINOPARM"Y pI <br />¢%IarlNpcx MILE ONE STREET CROSS SEOTION ROM <br />ROPpetl <br />OPTION 2: TWO—WAY CYCLE TRACK (CLASS IV) Gpxmtc eauARCxoR <br />SIDWAI K <br />PARIOVAY(MOCINVO) <br />
The URL can be used to link to this page
Your browser does not support the video tag.