Laserfiche WebLink
Mohammad Heiat <br />As a leader in the transportation field for more than 36 years, <br />Mohammad has substantial civil engineering experience In a broad <br />PE <br />range of public works and private residential and commercial <br />Principal•ln�Charge <br />development projects, He's extensively experienced in capital <br />Improvement facilities design, roadway and intersection Improvement <br />plans, master plans, runoff management plans, and drainage <br />structures. <br />Mohammad has served as project principal, quality control supervisor, <br />Education <br />project manager, and project engineer on the preparation of PS&Es <br />MS end BS, Civil Engineering <br />for numerous public works and private Infrastructure projects with <br />RegistraticnsiCortifieations <br />l ationser <br />emphasis on highway and street design, drainage and flood control <br />Professional ortIf <br />y6, CA <br />facilities design, Including culverts, open channels, and detention/ <br />storage basins. <br />Why select <br />Extensive public works on -call project <br />management and oversight <br />Significant PS&E preparation for public <br />Infrastructure projects <br />Expert in local agency processes, <br />procedures, and standards <br />Multi -disciplinary engineer <br />"Denolos projects completed with other Arms <br />Howard Way, Century Place and 16th Street Roadway <br />Rehabilitation, Costa Mesa, CA(principaldn•Charge) <br />Mohammad oversaw engineering design services for the rehabilitation <br />and re -construction of Howard Way; Century Place, and 16th <br />Street. Project improvements Included pavement reconstruction; <br />reconstructing damaged curb and gutter, cross guitera, and sidewalks; <br />driveways and driveway approaches; and wheel chair ramps to meet <br />ADA requirements, Design plans comply with the latest Caitrans, <br />Green Book, APWA, and City standards. <br />Oso parkway Roadway Widening, Mission Viejo, CA <br />(Project Manager) <br />Mohammad managed preparation of preliminary and final design plans <br />for widening improvements on Oso Parkway between the 1-6 freeway <br />and County Club Drive. A traffic capacity and operation analysis was <br />prepared for widening alternatives and the recommendation was to <br />add one lane in each direction on Oso Parkway and modify the signals <br />at County Club and Montanoso Drives. The widening improvements <br />require the acquisition of additional right of way on both sides of the <br />street and relocation of several utilities along the existing sidewalks, <br />The box culvert for Oso Greek is being lengthened to accommodate <br />the now lanes in each direction <br />