Laserfiche WebLink
Rack Miller <br />PE, PT©E <br />CIA/QC (Rock. E. Miller Associates) <br />Education <br />M$ and BS, Civil Engineering <br />RegistratlonslCertifieations <br />• Professional Engineer#29493 (Civil), <br />#1139 (Traffic), CA <br />• Certified Professional Traffic Operations <br />Engineer #205 <br />Why select <br />Recognized traffic and Complete Streets <br />expert <br />Detailed reviewer focusing on safety; <br />quality; and sound, implementable solutions <br />and Improvements <br />Recent City project experience and deep <br />understanding of focal needs <br />Unmatched knowledge of regional, state, <br />Federal, end international design guidelines <br />"Denotes projects completod with other Runs <br />VIM e <br />Rock Is a passionate traffo and transportation engineer who <br />specializes in planning with emphasis on active transportation and <br />Its contribution to placomaking, urban design, streotseapes, and <br />overall mobility, He is a subject matter expert on walking, biking, <br />and application to Complete Streets, Rock's 95 years of experience <br />Is well known to transportation professionals throughout North <br />America, in part due to his servloe as Internatlonal President of <br />the 15,000-member Institute of Transportation Engineers (ITE) in <br />2012 and his continuing service on the U.S. National Committee <br />on Uniform Traffic Control Devices and for the Transportation <br />Research Board. <br />Rock is a strong advocate In developing and standardizing unique <br />and Innovative concepts to better serve walking and biking. He is <br />also an excellent presenter and facilitator In building consensus for <br />complex transportation projects: This expertise, coupled with his <br />strong experience and credibility In traditional traffic engineering, <br />operation of traffic signals and traffic safely, are of great value in <br />presenting technically complex projects. <br />Santa Ana Cycle Track, Santa Ana, CA* <br />(Traffic EnglnoerlActive Transportation Planner) <br />Rock provided traffic engineering, design oversight, and active <br />transportation plans for this 2,4-mile separated bikeway within the <br />City of Santa Ana. The project Involved concept refinements and <br />precise alignment studies for the protected bike lanes utilizing <br />raised medians; landscape improvements, bulb -outs at designated <br />intersections, and traffic signal modifications. <br />Redonda Beach Cycle Track, Redondo Beach, CA* <br />(Project Manager) <br />Rock managed this project to develop plans for proposed bicycle <br />friendly facilities along two important roadways within theft Marina <br />district. The project, opened in June 2015, provides benefits <br />to motorized and non -motorized users, and further beautifies <br />Redondo's Harbor Gateway. Rook provided traffic analysis and <br />road diet and roundabout simulation, conceptual visualization, <br />field survey and aerial topography, civil design of the cycle track, <br />drainage facilities, and related signing and striping plans, He led <br />the design concepts and stakeholder and commission meetings, <br />along with several public workshops, <br />This project has won more then six technical awards and <br />commendations to date and is used by more than one million <br />cyclists annually. <br />