My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5
Clerk
>
Contracts / Agreements
>
N
>
NV5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2019 10:48:54 AM
Creation date
7/24/2018 10:46:37 AM
Metadata
Fields
Template:
Contracts
Company Name
NV5
Contract #
A-2018-160-04
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
5/1/2020
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTACT INFO DAVID NIKNAFSr PE <br />davld.niknafs@nv5,com eC pro <br />949.685.0477 t Manager <br />EXPERIENCE <br />30 year$ <br />EDUCATION <br />M.S. Civil Engineering <br />aA, Civil Engineering <br />LICENSES <br />Civil Engineer (CA) <br />No, 42697 <br />AFFILIATIONS <br />American Public Works <br />Association (APWA) <br />American Society of Civil <br />Engineers (ASCE) <br />Transportation & <br />Development Institute <br />Mr. Niknafs has more than 30 years of civil engineering oxperienee in the public <br />and private sectors working on various capital Improvement projects and has <br />extensive egparlance working as a project manager and senior engineer, He has <br />managed numerous publio works and development projects Including roadways, <br />bridges, drainage, sewer, water, underground utilities, building facilities and related <br />Infrastructure improvement, projects. <br />He is in Charge of providing overcall project direction to the project technical team <br />and providing resource allocation; preparing and administering budgets; preparing <br />and monitoring: projectsohsdulas; managing productipn of preliminary design <br />anit inal design; preparing various detailed teohnicai reports; providing oversight <br />and performing quality control; managing and monitoring construction activities; <br />establishing, Coordinating and maintaining working relationships with owners, <br />developers, and other agencies. <br />Project Experience <br />„N„ Street Widening Project <br />CITY OF SAN BERNARDINO I SAN BERNARDINO, CA <br />Project Manager. Mr Niknafs is responsible for providing professional design <br />engineering services Including plan$, specifications, cost estimates and related bid <br />documents for the widening of "H" Street from Kendall Drive to 40th Street. The <br />Project will Increase H Street from two lanes to four lanes and upgrade the existing <br />teafflo signals.ot 40th Street and Kendall Drive, The plans will Include roadway, <br />drainage, sewer, signing and striping, street lighting; modification to traffic signals, and <br />dwallltlon plans. We are coordinating with utility companies, identifying existing right- <br />ofway, conducting pavement investigation and preparing a report, and preparing all <br />required environmental studies end documents for clearance under CEQA. The street <br />Improvements will Include ADA•oompliant curb ramps. <br />Pacific Coast Highway Arterial Improvements <br />CITY OF REDONDO BEACH I REDONDO BEACH, CA <br />Project Manager. Mr, Niknefs is managing a comprehensive traffic analysis and <br />the preparation of preliminary design recommendations to reduce congestion <br />and Increase safety on pacific Coast Highway, Our team Is preparing final plans, <br />specifications and cost estimates for the intersection widening for a right-tum-only lane <br />on southbound Pacific Coast Highway and Torrance Boulevard. We will also provide <br />design and support services during bidding and construction phases, <br />Jamboree Road and intersection Widening <br />CITY OF IRVINC I RVINE, CA <br />Prejeet Manager/Contract Manager, Mr, Niknafs is responsible for providing program <br />and contract management services for the widening oriamborea Road from Main <br />Street to Barrance Parkway, The project will widen Jamboree Road from fourto five <br />through lanes In each direction, Intersection Improvements at Jamboree/Main and <br />Jamboree/Barranm are currently In the design and right of way phases and will be <br />constructed along with the widening. Mr. Niknafs is also responsible for coordination and <br />N V 5 monitoring required for all phases of work, <br />
The URL can be used to link to this page
Your browser does not support the video tag.