Laserfiche WebLink
Harbor Boulevard Street, Median and Landscape Improvements <br />CITY OF COSTA MESA I.COSTA MESA, CA <br />Project Manager. Mr. Niknafs managed the preparation of plans, specifications; and. oast estimates for the design of <br />Improvements on Harbor Boulevard, Including street and median landscaping improvements. The City was awarded Federal <br />Highway Safety Improvement Program funds to install medians, landscaping, and associated improvements to improve <br />pedestrian and traffic safety. A traffic analysis was conducted to establish median openings and turn pocket lane lengths. <br />Our team coordinated with stakeholders including the residents and business owners, and public outreach community <br />meetings were scheduled so the conceptual plans could be presented to the community. <br />Bast 19th Street Design Improvements <br />CITY OF COSTA MESA- I COSTA MESA, CA <br />Project Manager. Mr. Niknafs was responsible for the design of this roadway, median and parkway landscaping <br />improvements projeot. The project Included the removal of reconstruction of pavement; and reconstruction of curb, gutter, <br />cross gutter, sidewalk, wheelchair ramp and driveway. His responsibilities included managing the preparation of the plans, <br />specifications and cost estimates; and assisting the City with the preparation of PES and V6 certification, as wall as with <br />the submittal and processing through Caltrans. <br />Wilmington Avenue Pedestrian and Bicycle Improvements <br />CITY OFCOOMPTON I COMPTON, CA <br />Project Manager, Mr, Niknafs was responsible for providing professional design engineering services Including plans,. <br />specifications, cast estimates and related bid documents for. the Wilmington Avenue Safe Streets Pedastrian/$Icyoie <br />Improvement Project, The project included' pavement rehabilitation on Wilmington Avenue from El Segundo Boulevard to <br />RosecransAvenue, Scope of work consisted of various pedestrian and bicycle improvements; the Installation of wider and <br />colored crosswalks; countdown pedestrian signals; enhanced pedestrian lighting; the Installation of Class II bike Panes with <br />wayfindingslgnage and Class I bike paths; and the installation of four solar -powered speed feedback signs for speed control <br />and attainment. <br />li 201748 Annual Street Rehabilitation <br />CITY Or VILLA PARK VILLA. PARK, CA <br />Project Manager, Mr, Niknafs Is responsible for providing plans, specifications, and estimates for the ahnual rehabilitation <br />project, The improvements may include the removal and replacement of deteriorated sections of the streets by repaving <br />or slurry seal the streets; construction of curb and gutter or AC berm at certain locations of these streets; and the <br />replacement: of curb and gutters as needed to provide adequate drainage. <br />Colonial Avenue Alley Pavement Project <br />CITY OF CUL VER CITY I CULVER CITY, CA <br />Project Manager, Mr Niknafs is responsible for providing professional design services for the Colonial Avenue Alleyway, As <br />Part of the Community Development Block Grant (CDBG) program, the Colonial Avenue Alleyway Paving project Includes the <br />paving of approximately 800 LF by 20 feet wide of the alleyway, The scope of work also Involves field review, topographic <br />survey, design plans, bid schedule and technical specifications, quantity and cost estimates. <br />Expo Line Bus Stop Enhancement Project <br />CITY OF SANTA MONICA i SANTA MONICA, CA <br />Project Manager. Our team was selected to provide engineering design services for the Expo Line Bus Stop Enhancement <br />Project in Santa Monica, Phase 11 of the Expo line extends the line to Santa Monica, As a result, Big Blue Bus is <br />implementing a comprehensive redesign of Its transit systern to connect passengers with the Expo Line stations in <br />attempt to create a more efficient oemmuto for passengers. These initiatives also include the Inclusion of cignage, bus <br />berths and overall pedestrian improvements. Our team is providing preliminary, schematic and final design to include <br />construction documents detailing bus pads, ADA•compllant wheelchair pads, sidewalk extensions and the location of bus <br />stops, The work consisted of co0rdinaticn with various agencies and utility organizations. <br />