Laserfiche WebLink
cONTACTINFC) CHARLIE McKINI,EY P <br />onanlo,mskBnley@nv5.com e <br />949.685.0477 Project Manager <br />EXPERIENCE <br />30 years <br />EDUCATION <br />8.8, Biomedical <br />Engineering <br />LICENSES <br />Civil Engineer (CA) <br />No,C38484 <br />AFFILIATIONS <br />Member, Board of <br />Directors,society <br />of American Military <br />Engineers, orange County <br />Post <br />Member, American Public <br />Works Association <br />Inland Empire Chapter <br />President, WateReuse <br />Association <br />Mr, McKinley has more than 50 years Of experience as a professional engineer for <br />both large-scale capital improvement projects and small Infrastructure improvement <br />projects, He has a broad range of project experience with A focus on pipelines, pump <br />stations, reservoirs, and treatment. Mr. McKinley brings an enthusiastic approach to <br />planning, regulatory permuting, detailed design and operations review to facilitate civil <br />and environmental engineering projects, <br />Project Experience <br />Coronado Cays Sewage Lift StaTti.on <br />CITY OF CORONADO I CORONADO, CA <br />Teak Leader, Mr; McKinley was the task leader for the design of a complete overhaul <br />of an 870 gpm submersible pump station. Pumps, controls, wetwell configuration, and <br />various facility elements were replaced with current technology as part of the project, <br />Back Basin Storm Water Pump Station <br />ELI5INORE VALLEY MUNICIPAL W'ArER DISTRICT I LAKE ELSINORE, CA <br />Project Manager, This Project consisted of the preliminary and final design of a 2,500 <br />gpm stormwater pump station to accommodate the evacuation of stormwaterfrom the <br />book basin wetlands during an Overflow event from Lake Elsinore. <br />Mountain Belle Pump Station and Water Main <br />VISTA IRRIGATION DISTRICT I VISTA, CA - <br />Prnject Engineer, As project engineer, Mr, McKinley was responsible for the design <br />of an Interzone transmission main. Challenging terrain alignments and steep slope <br />Installations were avaivated, as well as surge and hydraulics. <br />Fullerton Road Grade Separation Stormwater and Groundwater Pump <br />Stations <br />ROWLAND WATER DISTRICT I INDUSTRY, CA <br />Project Manager, Responsible for the design of a 20,500 gpm stormwater pump <br />station and a 200 gpm groundwater pump station for the depression of Fullerton Road <br />under UPRR railroad tracks. The project Included a hydraulic analyses Of storm and <br />groundwater Inflow conditions to match with outflow hydrographs, and mechanical, <br />electrical, and structural design, Main pump station was permitted by the LACDPW, <br />Dudley Sewer Commission Consulting <br />TOWN OF DUDLEY I DUDLEY, MA <br />Project Manager. Development of design plans and specifications for three separate <br />sewer extension projects Involving approximately 18,000 feet of gravity sewer, 7,000 <br />feet of force main, and four duplex submersible pump stations with emergency power, <br />N V 15 odor control, and several low-pressure service areas with individual grinder pumps and <br />Small diameter force mains. Also completed a town wide Colmprehensive Wastewater <br />Management Plan, Including obtaining State Revolving Fund loans and performance of <br />hydraulic modeling of the sewer system, as well as an on -site system survey, <br />