cONTACTINFC) CHARLIE McKINI,EY P
<br />onanlo,mskBnley@nv5.com e
<br />949.685.0477 Project Manager
<br />EXPERIENCE
<br />30 years
<br />EDUCATION
<br />8.8, Biomedical
<br />Engineering
<br />LICENSES
<br />Civil Engineer (CA)
<br />No,C38484
<br />AFFILIATIONS
<br />Member, Board of
<br />Directors,society
<br />of American Military
<br />Engineers, orange County
<br />Post
<br />Member, American Public
<br />Works Association
<br />Inland Empire Chapter
<br />President, WateReuse
<br />Association
<br />Mr, McKinley has more than 50 years Of experience as a professional engineer for
<br />both large-scale capital improvement projects and small Infrastructure improvement
<br />projects, He has a broad range of project experience with A focus on pipelines, pump
<br />stations, reservoirs, and treatment. Mr. McKinley brings an enthusiastic approach to
<br />planning, regulatory permuting, detailed design and operations review to facilitate civil
<br />and environmental engineering projects,
<br />Project Experience
<br />Coronado Cays Sewage Lift StaTti.on
<br />CITY OF CORONADO I CORONADO, CA
<br />Teak Leader, Mr; McKinley was the task leader for the design of a complete overhaul
<br />of an 870 gpm submersible pump station. Pumps, controls, wetwell configuration, and
<br />various facility elements were replaced with current technology as part of the project,
<br />Back Basin Storm Water Pump Station
<br />ELI5INORE VALLEY MUNICIPAL W'ArER DISTRICT I LAKE ELSINORE, CA
<br />Project Manager, This Project consisted of the preliminary and final design of a 2,500
<br />gpm stormwater pump station to accommodate the evacuation of stormwaterfrom the
<br />book basin wetlands during an Overflow event from Lake Elsinore.
<br />Mountain Belle Pump Station and Water Main
<br />VISTA IRRIGATION DISTRICT I VISTA, CA -
<br />Prnject Engineer, As project engineer, Mr, McKinley was responsible for the design
<br />of an Interzone transmission main. Challenging terrain alignments and steep slope
<br />Installations were avaivated, as well as surge and hydraulics.
<br />Fullerton Road Grade Separation Stormwater and Groundwater Pump
<br />Stations
<br />ROWLAND WATER DISTRICT I INDUSTRY, CA
<br />Project Manager, Responsible for the design of a 20,500 gpm stormwater pump
<br />station and a 200 gpm groundwater pump station for the depression of Fullerton Road
<br />under UPRR railroad tracks. The project Included a hydraulic analyses Of storm and
<br />groundwater Inflow conditions to match with outflow hydrographs, and mechanical,
<br />electrical, and structural design, Main pump station was permitted by the LACDPW,
<br />Dudley Sewer Commission Consulting
<br />TOWN OF DUDLEY I DUDLEY, MA
<br />Project Manager. Development of design plans and specifications for three separate
<br />sewer extension projects Involving approximately 18,000 feet of gravity sewer, 7,000
<br />feet of force main, and four duplex submersible pump stations with emergency power,
<br />N V 15 odor control, and several low-pressure service areas with individual grinder pumps and
<br />Small diameter force mains. Also completed a town wide Colmprehensive Wastewater
<br />Management Plan, Including obtaining State Revolving Fund loans and performance of
<br />hydraulic modeling of the sewer system, as well as an on -site system survey,
<br />
|