Laserfiche WebLink
CONTACT INFO <br />DEREK WOIESKE; PE <br />derek.wleske@nv5,com <br />949,686,0477 <br />Quality ASsurance/Queiity Control <br />.............................. ............_,........,........,............ <br />EXPERIENCE <br />25 <br />...... .......................,................. ......,,......,............... ,--- .............. .......... .... <br />Mr. Wieske has more than 25 years of hands on experience In the development, <br />years <br />design and construction of capital improvement projects for public agenclas. His <br />EDUCATION <br />vast catalog of projects Includes roadways and pedestrian improvements; parks and <br />M,B,A, <br />landscaping, water and sewer infrastructure, and buildings. Mr. Wieske has served in a <br />M.S. l! Engineering <br />variety of (roles from City Engineer to Director of public Works for agencies throughout, <br />Southern California Including the cities of Lang Beach, Laguna Beach, Lake <br />B.S.Givivil.Enginear(ng <br />and Forest. <br />Project Experience <br />LICENSES <br />... ............ ., <br />Civil Engineer (CA) <br />No,49872 <br />Downtown Area Resurfacing <br />CITY OF LAGUNA BEACH i LAGUNA BEACH, CA <br />AFFILIATIONS <br />PrpJeot Manager. Mr. Wieske oversaw the design and construction of the resurfacing <br />Member, American Society <br />of the downtown area of Laguna Beach and coordinated with local businesses to <br />of Civil Engineers <br />minimize economic Impacts of construction, In addition to street resurfacing, the <br />Member (1993-1994), <br />project includedinstallation of various traffic calming features, such as bulbouts, <br />Standards:betting <br />Mr. Wieske Introduced a bonus clause Into the specifications, which significantly <br />Committee for the <br />accelerated project construction, resulting in praise from local shop owners for a <br />California State Board <br />successful project. <br />of Registration for <br />Professional Engineers <br />Stormwater Diversion systems Installation <br />and Land surveyore <br />CITY Or'' LAGUNA t3FACH I LAGUNA BEACH, CA <br />Member <br />Project Manager. Mr. Wieske was responsible for the design and construction of <br />e New Countrywide <br />stormwatorseparators (CDs Units) to divert urban runoff from roadways, and the City <br />Development and <br />stormdrain system to the municipal sewer collection system. Challenges Included <br />Construction Water Quality <br />working with sewer systems without disrupting service, and the design of a system that <br />Task Force <br />can be maintained with, relative ease. <br />- <br />Lexington Drive Road Improvements <br />CITY OF LOS ALAMITOS I LOS ALAMITOS, CA <br />ProjectManager. Mr, Wieske was responsible for the Installation of a half -mile <br />section of arterial highway from Katella Avenue to Cerritos Avenue. He reviewed <br />and approved plans and specifications and oversaw all construction management/ <br />nspertioneotivitlesfor this project. The project involved close coordination with the <br />representatives fromm the City of Cypress and an adjacent community church that was <br />funding the roadway improvements. <br />Ball Road and Bloomfield Street Intersection and Drainage Improvements <br />CITY OF LOS ALAMITOS I LOS ALAMITOS, CA <br />Project Manager, Mr. Wieake.served as the project manager for the installation of <br />1,400 LF of storm drain and roadway rehabilitation. The design alignment of the <br />storm drain conflicted with multiple utilities, including sewer, water, gas, electric, <br />and all pipelines. He oversaw the design of the project, Including' significant 'value <br />engineering, plan and specification quality control, bidding process, and coordination <br />with partnering funding agency. The project required extensive coordination with utility <br />agencies to either relocate or adjust conflicting utilities. <br />