CONTACT INFO
<br />DEREK WOIESKE; PE
<br />derek.wleske@nv5,com
<br />949,686,0477
<br />Quality ASsurance/Queiity Control
<br />.............................. ............_,........,........,............
<br />EXPERIENCE
<br />25
<br />...... .......................,................. ......,,......,............... ,--- .............. .......... ....
<br />Mr. Wieske has more than 25 years of hands on experience In the development,
<br />years
<br />design and construction of capital improvement projects for public agenclas. His
<br />EDUCATION
<br />vast catalog of projects Includes roadways and pedestrian improvements; parks and
<br />M,B,A,
<br />landscaping, water and sewer infrastructure, and buildings. Mr. Wieske has served in a
<br />M.S. l! Engineering
<br />variety of (roles from City Engineer to Director of public Works for agencies throughout,
<br />Southern California Including the cities of Lang Beach, Laguna Beach, Lake
<br />B.S.Givivil.Enginear(ng
<br />and Forest.
<br />Project Experience
<br />LICENSES
<br />... ............ .,
<br />Civil Engineer (CA)
<br />No,49872
<br />Downtown Area Resurfacing
<br />CITY OF LAGUNA BEACH i LAGUNA BEACH, CA
<br />AFFILIATIONS
<br />PrpJeot Manager. Mr. Wieske oversaw the design and construction of the resurfacing
<br />Member, American Society
<br />of the downtown area of Laguna Beach and coordinated with local businesses to
<br />of Civil Engineers
<br />minimize economic Impacts of construction, In addition to street resurfacing, the
<br />Member (1993-1994),
<br />project includedinstallation of various traffic calming features, such as bulbouts,
<br />Standards:betting
<br />Mr. Wieske Introduced a bonus clause Into the specifications, which significantly
<br />Committee for the
<br />accelerated project construction, resulting in praise from local shop owners for a
<br />California State Board
<br />successful project.
<br />of Registration for
<br />Professional Engineers
<br />Stormwater Diversion systems Installation
<br />and Land surveyore
<br />CITY Or'' LAGUNA t3FACH I LAGUNA BEACH, CA
<br />Member
<br />Project Manager. Mr. Wieske was responsible for the design and construction of
<br />e New Countrywide
<br />stormwatorseparators (CDs Units) to divert urban runoff from roadways, and the City
<br />Development and
<br />stormdrain system to the municipal sewer collection system. Challenges Included
<br />Construction Water Quality
<br />working with sewer systems without disrupting service, and the design of a system that
<br />Task Force
<br />can be maintained with, relative ease.
<br />-
<br />Lexington Drive Road Improvements
<br />CITY OF LOS ALAMITOS I LOS ALAMITOS, CA
<br />ProjectManager. Mr, Wieske was responsible for the Installation of a half -mile
<br />section of arterial highway from Katella Avenue to Cerritos Avenue. He reviewed
<br />and approved plans and specifications and oversaw all construction management/
<br />nspertioneotivitlesfor this project. The project involved close coordination with the
<br />representatives fromm the City of Cypress and an adjacent community church that was
<br />funding the roadway improvements.
<br />Ball Road and Bloomfield Street Intersection and Drainage Improvements
<br />CITY OF LOS ALAMITOS I LOS ALAMITOS, CA
<br />Project Manager, Mr. Wieake.served as the project manager for the installation of
<br />1,400 LF of storm drain and roadway rehabilitation. The design alignment of the
<br />storm drain conflicted with multiple utilities, including sewer, water, gas, electric,
<br />and all pipelines. He oversaw the design of the project, Including' significant 'value
<br />engineering, plan and specification quality control, bidding process, and coordination
<br />with partnering funding agency. The project required extensive coordination with utility
<br />agencies to either relocate or adjust conflicting utilities.
<br />
|