Laserfiche WebLink
CONTACT INPO KYLE HILTON, EIT <br />kyle.hlltan�nv5,00m <br />949.085,0477 Project Engineer <br />EXPERIENCE <br />dyesrs <br />Mr. Hilton has more than six years of experience In Public works Improvements, <br />including planning and design of streets, arterial streets, right•of-way engineering, and <br />EDUCATION <br />storm drain design. His professional experience also includes CAD drafting, bridge <br />8.8, Civil & Environmental <br />rating, Water Quality Management Plans (WQMP), Environmental Impact Reports (EIR), <br />Engineering <br />and Storm Water Pollution Prevention Plans (SWPPP). He also has also served various <br />LICENSES/CERTIFICATES <br />roles for staff augmentation assignments. <br />Civil Engineer•In4ralning <br />Project EXperjenCe <br />Rancho Palos Verdes Area 9 Now Striping and Signing <br />CITY OF RANCHO PALOS VERDES I RANCHO PALOS VERDES, CA <br />Design Engineer. Mr. Hilton was responsible for striping and signing plans for a large <br />neighborhood community, The project consisted of adding new signs and striping on <br />the streets of a neighborhood community, <br />Bristol Street Widening from Sid Street to Civic Center <br />CITY OP SANTA ANA l SANTA ANA, CA <br />Design Engineer, Mr. Hilton was responsible forthe design of the street widening <br />Plans, IandSCape plans and Irrigation plansforthis project. The project consisted of <br />adding an additional lane In each direction. Also, a median was constructed with a <br />decomposed granite walkway end a dry stream bed Was constructed in place of <br />gutter. <br />Grand Street Widening from f.st to 4th Street <br />CITY OF SANTA ANA i SANTA ANA, CA <br />Design Engineer. Mr. Milton was responsible forthe design of the street widening <br />plans, landscape plans and irrigation plans for this project. The project consisted of <br />adding an additional lane in each direction, Also, a median was constructed with a dry <br />stream bed in the middle to allow for runoff to percolate into the soil. <br />Memorial Park Walkway, Basketball Courts, and Volleyball Courts <br />Renovation <br />CiTY OF SANTA ANA I SANTA ANA, CA <br />Design Engineer. Mr. Hilton wag responsible forthe design of the walkway, basketball <br />courts, and volleyball courts reconstruction Plans for this project, <br />Expo Line Bus Stop Enhancement Project <br />CITY OF SANTA MONICA I SANTA MONICA, CA <br />Design Engineer, our team was selected to provide engineering design services and <br />Mr, Hilton is responsible for providing the final design of the bus stops while satisfying <br />the needs of multiple government agencies, Phase 11 of the Expo Line is expected to <br />V 15 be completed in late 2015 and will extend the line to Santa Monica. As a result, Pig <br />Blue Bus is implementing a comprehensive redesign of its transit system to connect <br />Passengers with the Expo Line stations in attempt to create a more efficient commute <br />for passengers; these Initiatives also include the Inclusion of signage, bus berths <br />and overall pedestrian improvements, Specifically, ourteom is providing preliminary, <br />schematic and final design, to Include construction documents detailing bus pads, <br />ADA-compliant wheelchair pads, sidewalk extensions and the location of bus stop <br />