Laserfiche WebLink
CONTACTINFO <br />KEVIN SALEH, PE, PMP <br />kovin.solah@nv5.00m <br />949,585.0477 <br />project Engineer <br />.................... <br />EXPERIENCE <br />24 <br />..... ................ ,..... ........ ,.., ....:..: <br />Mc Sarah has 24 years of experience as a civil engineer. His professional experience <br />years <br />EDUCATION <br />includes planning, design, construction management, and' construction support <br />services for a variety of public works projects, with specific <br />B.B. Civil Engineering <br />areas of practice in water <br />and wastewater, His.relevent experience includes water distribution and treatment <br />Diploma, Computer <br />facilities, pumping facilities, treatment plant projeate/processeo, reservoirs, pressure <br />reducing and surge facilities, blending facilities, disinfection <br />Programming <br />facilities, and flow <br />metering facilities. Wastewater projects lndudeconveyance systems, pu.mping <br />LICENSES <br />stations, and treatment plant projects and processes. <br />Civil Engineer (MD) <br />No,$6759 <br />. <br />pfOj00t EXj;Er(enl",e <br />ProjectManagement <br />.... ...:........ ................................................ <br />Professional <br />UCI Recycled Water Line <br />AFFILIATIONS <br />IRVINE RANCH WAI Ell DISTRICT I IRVINE, CA <br />Member of Engineers <br />without borders, UCI <br />Senior Project Engineer. Mr. Ssloh is currently providing the plans, specifications, <br />and estimates for the design as well as providing engineering construction <br />Chapter <br />services <br />for approximately 5,700 LF of 16-Inch and 3.2-inch pipellno in California Avenue <br />American Membrane <br />from University Drive to Theory Lane and on Academy Way and Peltason Drive from <br />Tachnolopykssooiation <br />California Avenue to the cooling towers, In addition, a new metering vault will be <br />Installed at the intersection of California Avenue and Academy Way, <br />Downtown Anaheim Recycled Water Expansion Design -Build Project <br />CITY OFANAHEIM I ANAIiFIM,CA <br />,Senior Project Engineer. Mr, Saleh was the designer forthis design-bulld effort in <br />conjunction with Arnaz Engineering for a new pump and tank system to replace the <br />existing irrigation punp supply system. The new system is designed to store (on -site) <br />recycled water in generated from the WRDF and will irrigate Pearson Park. The new <br />pump and tank system will connect to and operate with the existing Irrigation sprinkler <br />and controller system. <br />8-Inch and B-inch Water Main Replacement in Westford Street, Ardmore <br />Street and Calla del Norte Street <br />CITY OF ANAHEIM I ANAHE.IM, CA <br />Senior Project Engineer. Mr. Saleh was responsible for the design of abandonment <br />and replacement of existing, aging 4-Inch and 8-inch DIP main with now 6-Inoh and <br />8-inch PVC C-900 located in Westford, Ardmore and Calla del Norte Streets, Designs <br />also include the replacement of several service lines, meters, appurtenances, hydrants <br />and vslves. <br />Culver Boulevard Area Main Replacement <br />GOLDEN STATE WATER COMPANY I CULVER CITY, CA <br />Senior Project Engineer. Mr. Saleh was responsible for the design of replacement of <br />existing, aging 4-inch and 6-Ircli cast Iron water maim with 8-Inch DIP or PVC In Culver <br />Boulevard from Sepulveda Boulevard to Overland Avenue and in Wagner Street from <br />Sepulveda Boulavard to Coombs Avenue (approximately 7,000 feet). The project also <br />includes relocation of T-hrch and 2•Inel7 services and meters and abandonment of the <br />existing water mains in the alley east of Culver Boulevard and in Wagner Street. <br />