Anthony J. Lizzi
<br />Contract Manager
<br />at 58 various City parks for presence of lead in soil. Mr. Lizzi Is responsible for client interaction, and has extensive technical and
<br />practical experience in all aspects of assessing surface and subsurface geology, geochemistry, and contamination of soil, soil
<br />vapor, and groundwater.
<br />Los Angeles Department of Water and Power (LADWP), On -Call Environmental Consulting Services Contract Los An-
<br />geles, California: Principal Geologist for environmental projects such as Phase I and Phase II ESAs for this on-call contract at
<br />various sites throughout the LADWP footprint. Reviewed Phase I ESA reports on numerous sites in Southern California ranging
<br />from vacant, undeveloped land to Industrial properties. Managed the Phase II ESA field activities at numerous LADWP sites for
<br />soil, soil gas, and groundwater investigations. Performed senior review of technical documents.
<br />City of Colton, Guyaux Landfill, Phase II Work Pian, Colton, California: Principal Geologist managed the preparation of a
<br />Phase I ESA, Phase II Work Plan and Phase II ESA Implementation at a waste disposal site (WDS) measuring 4 acres to charac-
<br />terize and delineate the lateral and vertical extent of the wastes, including additional investigation of previously Identified "hot spot"
<br />areas of "soil" containing elevated lead concentrations. The work plan and the results of the Phase II ESA will be used to assist
<br />with evaluating whether the WDS can be capped/covered so the City can construct a 29 -acre soccer complex and community
<br />park.
<br />Port of Long Beach, On -Call Environmental Consulting Services Contract: Under the new, three -year -term contract, Mr.
<br />Lizzi is the Principal Geologist for the environmental services being performed In the areas of, but not limited to, Identification of
<br />hazardous materials used in the construction of buildings and appurtenance, including, but not limited to, asbestos containing
<br />materials, PCBs, and lead-based paint, or stored within or outside of any facilities; physical and chemical sampling and analyses
<br />for detection and delineation of surface and subsurface contamination of soil and groundwater; and small scale removal and/or
<br />abatement of asbestos containing materials and lead-based paint from structures scheduled for demolition or renovation.
<br />Anaheim Union High School District, Proposed School, Anaheim, California: Technical Advisor for a PEA of the West
<br />Lincoln Avenue properties site along West Lincoln Avenue and North Ohio Street in Anaheim, California. The school district is
<br />considering obtaining the site, which is adjacent to the Anaheim High School. In general, land use in the. vicinity of the site is
<br />primarily commercial and residential, and records indicated several of the current structures present since at least 1927. Ninyo &
<br />Moore's Phase I ESA identified some potential historical environmental issues including: former gasoline stations; and potential
<br />lead based paint and organochlorine pesticides, Ninyo & Moore designed sampling and analyses for these issues in a PEA work
<br />plan approved by the Department of Toxic Substances Control (DTSC) and performed the PEA. During the PEA, Ninyo & Moore
<br />conducted the soil and soil gas sampling in accordance with the PEA work plan, which followed the most current DTSC guidance
<br />documents. The field work Included collecting over 400 X -Ray florescence (XRF) readings and soil sampling results surrounding
<br />the historic site buildings. The results of the PEA have been presented to, and approved by, the DTSC. The PEA includes a health
<br />risk screening evaluation of COPCs detected in the shallow soil. We are assisting the school district with obtaining the School
<br />Cleanup Agreement with the DTSC which will proceed with the preparation of the Removal Action Work plan.
<br />California Department of General Services, Phase II Subsurface Investigation, Hollywood, California. Project manager for
<br />a Phase II subsurface investigation at a downtown parcel to assess recognized environmental conditions. Managing development
<br />of a field sampling and analysis program to evaluate the nature of any hazardous materials or substances that may be present in
<br />soil, soil gas, and groundwater at the subject site.
<br />Anthony J. Liu!, PG, CHG, Contract Manager I Ninyo & Moore I Geotechnical & Environmental Sciences Consultants
<br />
|