My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - AGMT METER INFRASTRUCTURE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
05/07/2019
>
25G - AGMT METER INFRASTRUCTURE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2019 6:17:26 PM
Creation date
5/2/2019 6:03:20 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25G
Date
5/7/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
32 <br />AMI Feasibilitv Report I Client Name: City of Santa Ana <br />7.6 CALL CENTER RESOURCES <br />The call center will be significantly impacted by the AMI system. As mentioned previously, during <br />the deployment period, the call center will likely experience an initial increase in call activity due to <br />the following: <br />G Customers calling to inquire about the AMI program and its impact to them. <br />Customers with billing questions because their bills increased - often due to a poorly performing <br />meter being replaced with a new accurate meter. <br />Q Customers needing to schedule an AMI installation visit due to access constraints. <br />Many utilities set up a specific toll free number to route all AMI -specific calls to a small specially <br />trained team but there will still be an initial increase in calls <br />As the meter installations continue and the initial wave of calls decrease, the overall call volume for <br />the call center will be reduced. Calls related to high bill complaints or billing errors will be reduced <br />because the AMI solution will ensure that estimated bills are practically eliminated and, thus, all <br />customers will receive a bill based on actual measured usage every time. This should allow City to <br />evaluate the call volume after the AMI system has stabilized and assess the call center resource <br />requirements. <br />7.7 ORGANIZATIONAL STRUCTURE <br />Given the discussion on duties and roles in this section, Black & Veatch recommends the following <br />approach to the organization and oversight for the City AMI program. Two organizational <br />structures are provided on Figures 9 and 10. Figure 9 shows the AMI implementation stage, and <br />Figure 9 shows the AMI sustainment operation stage. <br />25G-150 <br />
The URL can be used to link to this page
Your browser does not support the video tag.