My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75D - PH- MAIN PLACE TRANSFORMATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
06/04/2019
>
75D - PH- MAIN PLACE TRANSFORMATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 7:32:33 PM
Creation date
5/30/2019 5:10:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75D
Date
6/4/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
702
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
development, relative to that of county -wide development, is not <br />considered significant. Any structure constructed on the site over <br />approximately 58 feet in height would require Federal Aviation <br />Administration approval. The Federal Aviation Administration would make <br />a determination as to the aeronautical hazard of any proposed structures <br />which intrude above the imaginary horizontal surface of 203 feet above <br />sea level. Flashing -red obstruction lights might be required as a <br />1-. <br />precaution for aircraft safety. <br />Mitigation Measures <br />No mitigation measures are proposed. <br />2.13 Public Services and Utilities <br />Natural Gas <br />Project Impacts <br />l:. <br />1. <br />The project would consume approximately 86,210,000 cubic feet <br />La of natural gas per month. The project would not have a significant <br />impact on Southern California Gas Company's ability to provide gas <br />service to the project. <br />r <br />�A <br />Mitigation Measures <br />ki No mitigation measures are proposed other than the energy <br />conservation measures discussed in Section 5.14 (Energy) of this report. <br />s <br />Electricity <br />Project Impacts <br />The project would consume approximately 13,054,240 Kwh of <br />electricity per month. The project would be served by existing <br />Mul 56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.