My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-040 - Mainplace Mall Transformation
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2019
>
2019-040 - Mainplace Mall Transformation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2019 10:01:52 AM
Creation date
6/20/2019 8:39:53 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2019-040
Date
6/4/2019
Destruction Year
P
Document Relationships
2019-041 - Approving Tentative Parcel Map No. 2018-01
(Amended By)
Path:
\Resolutions\CITY COUNCIL\2011 -\2019
NS-2967 - Approving Development Agreement No. 2018-02 Between City of Santa Ana and Mainplace ShoppingTown, LLC for Mainplace Mall Transformation Project
(Amended By)
Path:
\Ordinances\2011 - 2020 (NS-2813 - NS-3000)\2019 (NS-2963 - NS-2978
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2935
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana Addendum to the <br />MainPlace Mall Transformation Proiect Fashion Square Commercial Center Final EIR <br />Summary of Impacts Identified in the 1996 Addendum <br />The 1996 Addendum described that the then requested entitlements were within the <br />approved square footage for the existing commercial shopping complex and are <br />consistent with the current land use. Thus, it concludes no land use impacts would <br />result. <br />The 1996 Addendum stated that City standards for parking are based on requirements <br />for strip mall developments, which have considerably different parking needs than a <br />regional shopping mall. It also stated that a variance would be required to reduce the <br />required parking. The City determined that some parking crowding may occur during the <br />Christmas holiday season, but that no other parking crowding is anticipated, and the <br />impact was determined to be less than significant. <br />Impacts Associated with the Proposed Project <br />No New Impact <br />General Plan Consistency <br />The proposed Project would adjust the land use at buildout of the Project site by <br />reducing commercial and office space and including residential units. The site is <br />currently designated by the City's General Plan as the MainPlace District Center. The <br />General Plan describes that District Centers are to serve as anchors to the City's <br />commercial corridors and accommodate major development activity. The MainPlace <br />District Center is a mixed -use designation identified in the General Plan as including a <br />"regional shopping center and office complex, as well as high -intensity housing and <br />mixed -use development" (Land Use Element, page A-22). <br />Table A-2 of the General Plan identifies that the MainPlace District Center designation <br />allows a Floor Area Ratio (FAR) of 2.1. The General Plan provides that the FAR should <br />be calculated on an area -wide basis rather than on a per -lot basis. In addition, District <br />Centers are allowed up to 90 dwelling units per acre for residential uses. <br />The MainPlace District Center designation would allow up to 4,486,074 square feet of <br />mixed uses, inclusive of residential uses, based on the maximum FAR of 2.1 over the <br />49-acre site. As proposed, the Project would result in a District -wide FAR of 2.08 with a <br />density of 39 dwelling units per acre, which is within the maximum allowed by the <br />General Plan MainPlace District Center designation. Thus, the proposed Project would <br />not result in impacts related to the General Plan land use designation of the Project site. <br />No new impact would occur. <br />Zoning Consistency <br />The existing zoning for the Project site is Commercial (C2), which includes a range of <br />commercial uses, as well as all of the uses allowed in the C1 zone. As described above, <br />1983 EIR Mitigation Measure MM 5.1-1(d) requires that development of the Project site <br />occur through a specific plan process that would provide information on how <br />
The URL can be used to link to this page
Your browser does not support the video tag.