Laserfiche WebLink
City of Santa Ana <br />MainPlace Mall Transformation Project <br />traffic Impact Study <br />Table 8: Project Trip Generation <br />Land Use <br />ITE Code <br />Unit <br />Trip Generation Rates' <br />AM Peak Hour <br />PM Peak Hour <br />Daily <br />In <br />Out <br />Total <br />In <br />Out <br />Total <br />Shopping Center <br />820 <br />KSF <br />37.750 <br />0.583 <br />0.36 <br />0.940 <br />1.829 <br />1.981 <br />3.81 <br />General Office Building <br />710 <br />KSF <br />9.740 <br />0.998 <br />0.16 <br />1.160 <br />0.184 <br />0.966 <br />1.15 <br />Hotel <br />310 <br />Room <br />8.360 <br />0.277 <br />0.19 <br />0.470 <br />0.306 <br />0.294 <br />0.60 <br />Multi -family Housing <br />(Mid -Rise) <br />221 <br />DU <br />5.440 <br />0.094 <br />0.266 <br />0.360 <br />0.268 <br />0.172 <br />0.440 <br />Land Use <br />Quantity <br />Unit <br />Trip Generation Estimates <br />AM Peak Hour <br />PM Peak Hour <br />Daily <br />In <br />Out <br />Total <br />In <br />Out <br />Total <br />Existing Main Place Development (2018) <br />Shopping Center <br />1,130.00 <br />1 KSF <br />1 42,658 <br />1 659 <br />1 403 <br />1 1,062 <br />1 2,067 <br />1 2,239 <br />4,306 <br />Main Place Proposed Project <br />Shopping Center <br />270.00 <br />KSF <br />10,193 <br />157 <br />96 <br />253 <br />494 <br />535 <br />1,029 <br />General Office Building <br />750.00 <br />KSF <br />7,305 <br />749 <br />122 <br />871 <br />138 <br />725 <br />863 <br />Hotel <br />400 <br />Room <br />3,344 <br />111 <br />77 <br />188 <br />122 <br />118 <br />240 <br />Multi -family Housing <br />(Mid -Rise) <br />1,900 <br />DU <br />10,336 <br />179 <br />505 <br />684 <br />509 <br />327 <br />836 <br />Subtotal MainPlace Project Trips <br />31,178 <br />1,196 <br />800 <br />1,996 <br />1,263 <br />1,705 <br />2,968 <br />Total Existing MainPlace Development (2018) Plus Main Place Proposed Project <br />Shopping Center <br />1,400.00 <br />KSF <br />52,851 <br />816 <br />499 <br />1,315 <br />2,561 <br />2,774 <br />5,335 <br />General Office Building <br />750.00 <br />KSF <br />7,305 <br />749 <br />122 <br />871 <br />138 <br />725 <br />863 <br />Hotel <br />400 <br />Room <br />3,344 <br />111 <br />77 <br />188 <br />122 <br />118 <br />240 <br />Multi -family Housing <br />(Mid -Rise) <br />1,900 <br />DU <br />10,336 <br />179 <br />505 <br />684 <br />509 <br />327 <br />836 <br />Total 2018 Existing + Proposed Project <br />73,836 <br />1,855 <br />1,203 <br />3,058 <br />3,330 <br />3,944 <br />7,274 <br />Internal Capture (8%AM, 18%PM) Z <br />-12,130 <br />-148 <br />-96 <br />-244 <br />-599 <br />-710 <br />1309 <br />Pass -By Reduction for Retail (15%) 3 <br />-656 <br />- <br />- <br />- <br />-315 <br />-341 <br />-656 <br />Total Project Trips <br />61,050 <br />1,707 <br />1,107 <br />2,814 <br />2,416 <br />2,893 <br />5,309 <br />1. Source: Institute of Transportation Engineers (ITE) Trip Generation Manual. 10'h Edition <br />2. Source: Institute of Transportation Engineers (ITE) Trip Generation Handbook, 3rd Edition; Note: The Daily Internal Capture is <br />the weighted average of the AM and PM Internal Capture <br />3. Source: Institute of Transportation Engineers (ITE) Trip Generation Handbook, 3rd Edition; Pass -by rates are not provided for <br />the AM peak hour. For a conservative analysis, the PM peak hour pass -by rate was reduced from 34%to 15%. The Daily pass - <br />by is the sum of the PM peak hour inbound and outbound pass -by trips. <br />Kimley>»Horn Page 127 <br />