Laserfiche WebLink
City of Santa Ana <br />MainPlace Mall Transformation Project <br />traffic Impact Study <br />Table 9: Currently Entitled Development Trip Generation <br />Land Use <br />ITE Code <br />Unit <br />Trip Generation Rates' <br />AM Peak Hour <br />PM Peak Hour <br />Daily <br />In <br />Out <br />Total <br />In <br />Out <br />Total <br />Shopping Center <br />820 <br />KSF <br />37.750 <br />0.583 <br />0.36 <br />0.940 <br />1.829 <br />1.981 <br />3.81 <br />General Office Building <br />710 <br />KSF <br />9.740 <br />0.998 <br />0.16 <br />1.160 <br />0.184 <br />0.966 <br />1.15 <br />Hotel <br />310 <br />Room <br />8.360 <br />0.277 <br />0.19 <br />0.470 <br />0.306 <br />0.294 <br />0.60 <br />Land Use <br />Quantity <br />Unit <br />Trip Generation Estimates <br />AM Peak Hour <br />PM Peak Hour <br />Daily <br />In <br />Out <br />Total <br />In <br />Out <br />Total <br />Existing MainPlace Development (2000) <br />Shopping Center <br />1,108.08 <br />1 KSF <br />41,830 <br />646 <br />396 <br />1,042 <br />2,027 <br />1 2,195 <br />4,222 <br />Current MainPlace Entitlement (2000) <br />Shopping Center <br />401.175 <br />KSF <br />15,144 <br />234 <br />143 <br />377 <br />734 <br />795 <br />1,529 <br />General Office Building <br />1,500.00 <br />KSF <br />14,610 <br />1,497 <br />243 <br />1,740 <br />276 <br />1,449 <br />1,725 <br />Hotel <br />400 <br />Room <br />3,344 <br />111 <br />77 <br />188 <br />122 <br />118 <br />240 <br />Subtotal MainPlace Project Trips (2000) <br />33,098 <br />1,842 <br />463 <br />2,305 <br />1,132 <br />2,362 <br />3,494 <br />Existing MainPlace Development (2000) Plus Current MainPlace Entitlement (2000) <br />Shopping Center <br />1,509.255 <br />KSF <br />56,974 <br />880 <br />539 <br />1,419 <br />2,761 <br />2,990 <br />5,751 <br />General Office Building <br />1,500.00 <br />KSF <br />14,610 <br />1,497 <br />243 <br />1,740 <br />276 <br />1,449 <br />1,725 <br />Hotel <br />400 <br />Room <br />3,344 <br />111 <br />77 <br />188 <br />122 <br />118 <br />240 <br />Total Existing Development (2000) + Current <br />Entitlement (2000) <br />74928 <br />2488 <br />859 <br />3,347 <br />3,159 <br />4,557 <br />7,716 <br />Internal Capture (11% AM,8% PM) Z <br />-6,833 <br />-274 <br />-94 <br />-368 <br />-253 <br />-365 <br />-618 <br />Pass -By Reduction for Retail (15%) 3 <br />-794 <br />- <br />- <br />- <br />-381 <br />-413 <br />-794 <br />Total Year 2000 Project Trips <br />67,301 <br />2,214 <br />765 <br />2,979 <br />2,525 <br />3,779 <br />6,304 <br />1. Source: Institute of Transportation Engineers (ITE) Trip Generation Manual. 101h Edition <br />2. Source: Institute of Transportation Engineers (ITE) Trip Generation Handbook, 3`d Edition; Note: The Daily Internal Capture <br />is the weighted average of the AM and PM Internal Capture <br />3. Source: Institute of Transportation Engineers (ITE) Trip Generation Handbook, 3`d Edition; Pass -by rates are not provided <br />for the AM peak hour. For a conservative analysis, the PM peak hour pass -by rate was reduced from 34%to 15%. The Daily <br />pass -by is the sum of the PM peak hour inbound and outbound pass -by trips. <br />Kimley>»Horn Page 128 <br />