Laserfiche WebLink
CUP No. 2019-30 & VAR No. 2018-01 <br />CUP No. 2019-31 <br />September 9, 2019 <br />Page 2 <br />Table 1: Project and Location Information <br />Item <br />information <br />301 & 325 North Tustin Avenue <br />North Tus6i Avenue and East Fourth Street <br />Project Address <br />Nearest Intersection <br />Surrounding Land Uses <br />(Exhibit 4) <br />North <br />Commercial <br />East <br />Costa Mesa SR-55 Freew2ylCq of Tustin <br />South <br />Commercial - City of Tustin <br />West <br />Professional - Service Station <br />General Plan Designation <br />General Commercial GC <br />General Commercial C2 <br />Zoning Designation <br />Property Size <br />Existing Site Development <br />39,775 SF (0.9 acres) - 301 N. Tustin Avenue <br />22,465 SF (0.5 acres) - 325 N. Tustin Avenue <br />Vacant - 301 N. Tustin Avenue <br />Gas Service Station & Car Wash - 325 N. Tustin Avenue <br />Development Standards <br />SANK Sections 41-368 through 41-374 <br />Sections 41-379 through 41-386 <br />SAMC Section 41-365.5(h) and Section 41-377.5(b) <br />Use Permissions/CUP/Variance <br />Protect Description <br />The applicant proposes to demolish the existing service station, car wash, and convenience store to <br />construct a new service station with 3,040-square foot convenience store and new automated car <br />wash on the two properties at the southeast corner of Tustin Avenue and Fourth Street. <br />The property at 301 North Tustin Avenue is currently vacant and is the site for the proposed <br />automated car wash. The 4,354-square foot car wash tunnel will be located adjacent to the <br />southern property line which allows vehicles to enter or exit on Tustin Avenue or to enter or exit on <br />Fourth Street with reciprocal access provided from the service station property to the north. The car <br />wash will feature two pay points and has 189 feet of stacking which exceeds the standard of 120 <br />feet of stacking (12 vehicles). The site will contain 20 vacuum bays for customers and three <br />onsite employee parking spaces. The proposed hours of operation are from 7:00 a.m. to 7100 <br />p.m. during the winter months, and 7:00 a.m. to 8:00 p.m. during summer months (Daylight <br />Saving months). <br />The parcel immediately to the north (325 North Tustin Avenue) is also proposed for redevelopment. <br />The applicant is proposing to demolish the existing service station, close a driveway on Fourth <br />Street and redesign the site with a service station and larger convenience store. The service station <br />will consist of a 2,843-square foot canopy with six pump islands (12 pumps total), a new 3,040- <br />square foot convenience store and 13 parking spaces. In addition, a lot line adjustment will be <br />processed administratively to increase the lot size, improve on -site circulation and to provide a 35- <br />foot high freestanding sign for the service station adjacent to the SR-55 freeway along the east <br />75W?l05 <br />