Laserfiche WebLink
0 <br />REQUEST FOR PROPOSAL <br />Water Resources Construction Management and Inspection Services <br />(RFP NO. 19-118) <br />JEROME RUDDINS, CCM , QSP, CISEC, HAZWOPER <br />Principal -in -Charge / QA/QC <br />Jerome has served in this role on over billion <br />of public works projects in the past 34 years. His <br />experience encompasses potable water lines, recycled <br />water lines, sewer systems, cathodic protection, <br />reservoirs, wells, clear wells, treatment plants, pump <br />stations, storm drains, program management, project management, <br />construction management, inspection, specifications, estimating, <br />constructability reviews, bidding, permits, utility research, contract <br />administration, value engineering, scheduling, public relations, safety, <br />RFI's, submittals, quality control, quantity verification, progress <br />payments, certified payroll, change orders, surveying, material testing, <br />SCADA, telemetry, disinfection, testing, start-up, O&M manuals, <br />record drawings, claim mitigation, and expert witness testimony. Each <br />construction project presents its own unique issues and concerns. <br />Jerome has a knack for seeing these items and in resolving them well <br />before they affect the schedule and the budget. Jerome will ensure that <br />we provide the City with the precise level of staffing it desires, that each <br />project is built properly, and that the Citys expectations are met and <br />BILL SEITZ, PE, HAZWOPER, OSHA <br />Senior Construction Manager <br />UBill will support Kieler in construction management <br />aspects of the on -call contract. With over 25 years <br />of engineering and construction experience, Bill has <br />consistently been responsible for the CM and inspection <br />of numerous public works projects such as On -Call <br />Public Works CM/CI Services for the City of Lake Forest, South Coast <br />Water District Creekside Wellhead Facilities and Pipeline project, and <br />various federal and state funded projects for the County of Santa Ana. <br />His experience encompasses water and sewer lines; reservoirs; pump <br />stations; wells; storm drains; channels; and other infrastructure projects. <br />He has successfully served as CM on numerous similar public works <br />projects, and is well versed in coordinating teams to deliver projects on - <br />time and within budget. <br />PATRICK HANIFY, PE, CCM, LEED AP, CISEC, QSD <br />Construction Manager <br />Patrick will support Kieler and Bill in construction <br />management aspects of the on -call contract. With over <br />14 years of experience of engineering and construction <br />experience, Patrick often managed projects. His degree <br />in engineering coupled with his design experience in <br />public works, water resources and land development projects, provide <br />his with a solid foundation for Construction Management and Inspection <br />work. His responsibilities include the processing and reviewing <br />RFI's, CCO's, RFQ's, shop drawings and submittals. He also reviews <br />baseline CPM schedules, progress payments and bid documents; <br />upholds code requirements; conducts progress meetings and organize <br />meeting minutes; coordinates daily operations with Contractors; field <br />inspections and materials testing; documentation of projects utilizing <br />record drawings, digital photography, observation reports and quantities; <br />coordinating with various agencies, utilities and residents, ensuring <br />traffic control and site safety; and maintaining public relations. <br />NICK CANALE, CPII, QSP, NASSCO ITCP, CIPP, ACI, <br />HAZWOPER, OSHA <br />Construction Inspector <br />Nick possesses over 12 years of construction inspection <br />a experience and has successfully served in this role on <br />t' several similar landscaping and irrigation, stormwater, <br />sewer, and storm drain, improvement projects. <br />Recent projects include the Marshall R. Bowen Pumping Plant No. 2 <br />Replacement, La Pata/Vista Hermosa Sports Park, Earl Schmidt Intact <br />Pump Station Improvements Project, and various federal and state <br />funded projects for the City of West Hollywood. <br />Nick will keep detailed records and retain files for potential audit <br />purposes. His typical duties include: performing daily inspections; <br />administering contract documents; upholding code requirements; <br />conducting weekly progress meetings; processing submittals, requests <br />for information, change orders, and progress payments; ensuring QC <br />and verifying quantities; coordinating with various agencies, utility <br />companies, material testers, surveyors, merchants, and residents; <br />monitoring the Contractor's construction schedule and safety plan; <br />maintaining public relations; generating the final punch list; and <br />documenting the work via daily reports and digital photography. <br />Proposal I Page 5 Water Resources RFP No. 19-118 <br />INTERNATIONAL <br />