Laserfiche WebLink
>F; REQUEST FOR PROPOSAL "tea <br />r> <br />Water Resources Construction Management and Inspection Services <br />='P (RFP NO. 19-118) a "' <br />Gerald Desmond Bridge Replacement I Waterline Relocation, Gerald Desmond Bridge Replacement S. Pico Avenue 20", 24", <br />1611, 18", & 24" Transmission Mains 300 BW & 30" Water Transmission Main 300J <br />Long Beach, CA Long Beach, CA <br />As part of the Michael Baker <br />on -call services agreement, <br />we were selected by the Long <br />Beach Water Department <br />(LBWD) to provide <br />construction inspection <br />services for this pipeline <br />relocation project necessitated <br />by the construction of the <br />New Gerald Desmond Bridge <br />in Long Beach. The work involved approximately 200 If of 16" DIP and <br />1,900 If of 24" DIP waterline. Michael Baker's duties encompassed: <br />providing construction inspection and contract administration; verifying <br />quantities and insuring quality control; monitoring pressure testing, <br />chlorination, flushing, Bac-T testing; and preparing daily construction <br />reports, digital photos and the punch list. <br />Relevance to the City: <br />Client: Long Beach Water <br />• Active site at the Port of <br />Department <br />Long Beach <br />Dates: 3/2016 - 11/2016 <br />• Coordination with <br />Gerald Desmond <br />Contact: <br />Bridge Contractor <br />Robert Verceles, PE <br />NET.Tit= <br />Team Members Involved: (562) 570-2337 <br />Kieler Smith, PE <br />Jerome Ruddins, CCM <br />Eric Eljenholm, EIT <br />Nora Doyle MA <br />As part of our on -call services agreement, Michael Baker was selected <br />by the LBWD to provide construction inspection services for this <br />pipeline relocation project necessitated by the construction of the New <br />Gerald Desmond Bridge in Long Beach. The work involved 100 LF of <br />24", 282 LF of 20", and 22 LF of 30" CML&C steel pipeline, butterfly <br />valves, buttstraps, connections, blow -offs, and night work. Michael <br />Baker's duties encompassed: providing construction inspection and <br />contract administration; verifying quantities and ensuring quality control; <br />monitoring the Contractor's safety plan; observing water knife potholing, <br />pressure testing, chlorination, flushing, and Bac-T testing; and preparing <br />daily construction reports, digital photos, and the punch list. <br />Relevance to the City: <br />• Active site at the Port of <br />Long Beach <br />• Coordination with <br />Gerald Desmond <br />Bridge Contractor <br />Team Members Involved: <br />Kieler Smith, PE <br />Jerome Ruddins, CCM <br />Eric Eljenholm, EIT <br />Nora Doyle <br />Client: Long Beach Water <br />Department <br />Dates: 2018 <br />Contact: <br />Robert Verceles, PE <br />Phone: <br />(562)570-2337 in <br />Proposal I Page 14 Water Resources RFP No. 19-118 <br />INTERNATIONAL <br />