My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT FOR ON-CALL CONSTRUCTION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
25F - AGMT FOR ON-CALL CONSTRUCTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2020 1:50:46 PM
Creation date
4/16/2020 12:52:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
4/21/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w; REQUEST FOR PROPOSAL 3' <br />Water Resources Construction Management and Inspection Services <br />y (RFP NO. 19-118) <br />Golden Lantern 1 Stonehill Recycled Water Distribution 1-5 Ortega Highway Interchange Pipeline Relocation, CIP No. <br />Improvements 11805 <br />Dana Point, CA San Juan Capistrano, CA <br />Michael Baker was selected by the South Coast Water District to provide <br />construction management and inspection services for this $2,720,375 <br />project which will help the SCWD increase capacity and maintain <br />reliable service to recycled water customers. The work includes 3,690 <br />LF of 12", 360 LF of 8", & 190 LF of 14" diameter PVC, associated <br />valves, & appurtenances; connections to existing mains; a pressure <br />reducing station; new electrical service, power and control interface <br />with the District's SCADA system; installing a <br />SCADA control panel, PLC, & HMI; and installing an t� <br />antenna for radio communications with the SCADA <br />panel. Michael Baker's duties include: construction <br />management; inspection; contract administration; q\ <br />change management; progress meetings; permit <br />coordination; photographic documentation of the work; <br />progress payment review; daily report preparation; <br />electrical inspection; submittal and RFI processing; <br />safety monitoring; schedule monitoring; SWPPP <br />monitoring; working day statement preparation; utility <br />coordination; and coordinating with the Agency, city of <br />Dana Point, and Design Engineer. <br />Relevance to the City: <br />• Construction <br />Management & <br />Inspection Services <br />• Bridge Contractor <br />Team Members Involved: <br />Jerome Ruddins, CCM <br />Kieler Smith, PE <br />Nora Doyle <br />Client: South Coast Water District <br />Dates: 3/2016 - 11/2016 <br />Contact: <br />Taryn Kjolsing, PE <br />Phone: <br />(949) 499-4555 x3171 <br />Michael Baker provided construction management and inspection <br />services on this $1,990,113 pipeline replacement project for the City <br />of San Juan Capistrano. The work included: installing approximately <br />3,611 LF of 12" PVC pipe; 700 LF of 12" CML&C pipe to be constructed <br />in the 1-5 Bridge; abandonment and relocation of water lines; services <br />and appurtenances; and the removal of ACP. Michael Baker's duties <br />included: project management; contract administration; construction <br />management; construction inspection; relief inspection; construction <br />engineering support; resident engineering; scheduling; community <br />outreach and public relations; monitoring the Contractor's traffic control <br />and safety plan; monitoring environmental compliance, surveying, soils <br />& material testing, and welding testing; <br />and testing & startup. <br />Relevance to the City: <br />• Construction <br />Management & <br />Inspection Services <br />• Bridge Contractor <br />Team Members Involved: <br />Jerome Ruddins, CCM <br />Bill Seitz, PE <br />Kieler Smith, PE <br />Nora Doyle <br />Client: City of San Juan Capistrano <br />Dates: 2015 <br />Contact: <br />Eric Bauman, PE <br />Phone: <br />(949) 487-4312 <br />L6U26WA;Wl"a' Proposal I Page 16 Water Resources RFP No. 19-118 <br />INTERNATIONAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.