My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SHAMROCK SUPPLY COMPANY, INC
Clerk
>
Contracts / Agreements
>
S
>
SHAMROCK SUPPLY COMPANY, INC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 8:39:00 AM
Creation date
6/23/2020 8:58:24 AM
Metadata
Fields
Template:
Contracts
Company Name
SHAMROCK SUPPLY COMPANY, INC
Contract #
A-2020-115
Agency
PUBLIC WORKS
Council Approval Date
6/2/2020
Expiration Date
6/30/2025
Insurance Exp Date
10/29/2024
Destruction Year
2030
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U <br />I. INTRODUCTION / PROJECT DESCRIPTIOIN <br />Nature of Work: <br />The City of Santa Ana ("City") seeks proposals to obtain the services of a qualified firm to <br />provide maintenance, repair and operations supplies on a consignment basis. <br />Electronic Proposal Submittal and Si ng ature: <br />Four [4] hard copies are required to accompany an electronic submittal of the complete <br />proposal package on PlanetBids. One of the hard copies shall be marked as "ORIGINAL" and <br />shall be signed by a company official with the power to bind the company and submitted to <br />the City of Santa Ana. Please be explicit in identiing the appropriate person with legal <br />authority to bind the company. <br />The Statement of Qualifications shall be limited to a maximum of twenty (20) double -sided <br />pages (excluding front and back covers; section dividers; and attachments such as resumes, <br />forms). Font size shall be minimum I 1-point Arial. Proposal exhibits shall be maximum I I" <br />x 17". <br />Proposal Evaluation and Rating; <br />The criteria for evaluating the proposals submitted will take the following items into <br />consideration: <br />1. Responsiveness to the RFP <br />2. Qualifications and Experience <br />3. Pricing <br />MAXIMUM <br />EVALUATION <br />POINTS <br />30 <br />30 <br />40 <br />TOTAL: 100 <br />The City has established a proposal review committee to evaluate proposers based on the <br />response to the RFP, which includes adherence to outlined instructions and format, and the <br />City evaluation criteria set forth above. A final score will be calculated for each submitted <br />proposal and used to rank the proposers. <br />Project Funding_ <br />In the event sufficient budgeted funds are not available for a new fiscal period, the City shall <br />retain the right to notify the provider of such occurrence in writing at least thirty (30) days <br />before the end of the current fiscal period and terminate the contract on the last day of the <br />current fiscal period without penalty or expense to the City. <br />City of Santa Ana RFP 20-019 <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.