Laserfiche WebLink
2) <br />3) <br />o. Any other work required to successfully plan for projects and adequately assess project <br />feasibility <br />Environmental Documentation/Permitting <br />Firms shall be capable of perfornng the following tasks: <br />a. Prepare and file all necessary environmental documents and apply for all required <br />permits including, but not limited to: <br />i. California Environmental Quality Act (CEQA) <br />ii. National Environmental Policy Act (NEPA) <br />iii. Federal Clean Water Act Section 401 <br />iv. Federal Clean Water Act Section 404 <br />v. California Department of Fish and Wildlife (CDFW) Section 1602 <br />vi. Orange County Sanitation District (OCSD) Discharge Permits <br />vii. Orange County Flood Control District (OCFCD) Encroachment Permit <br />Project Design <br />Firms shall be capable of performing the following tasks: <br />a. <br />b. <br />C. <br />d. <br />e. <br />f. <br />9. <br />h. <br />i. <br />j. <br />k. <br />Land Surveying <br />Civil -Engineering Design <br />Structural Design <br />Geotechnical Design <br />Architectural Design <br />Electrical Design <br />Mechanical Design <br />Instrumentation and Control Systems Design <br />Landscape Architecture and Irrigation Design <br />Detailed Engineering/Cost Estimation <br />Preparation of construction bid documents and specifications <br />Any other work required to complete project design <br />General Requirements and Project Deliverables <br />Design level survey and base mapping of the project site shall be prepared in US Customary <br />English units by a California licensed Land Surveyor in accordance with the City <br />guidelines and in Microstation V8i Computer Aided Design and Drafting (CADD) format. <br />The horizontal datum shall be NAD 83 and the vertical datum shall be NAVD 88. All <br />survey field notes shall be on forms provided by the City, shall be neatly completed in <br />pencil, and shall become property of the City upon completion of the project. Informal field <br />investigations including marking of removal areas may be required for some of the <br />sidewalk, curb and gutter, and pavement replacement projects. <br />City of Santa Ana RFP 20-102 Page Al-3 <br />