Laserfiche WebLink
A: The hotel will be 10 floors and the residential will be 16 floors. <br />Q: Will all the residential units be apartments? <br />A: yes, all apartments, no condominiums. <br />Q: Were there any circulation studies done? <br />A: Yes, prior to the design process, a traffic and parking study was done. This <br />was a requirement of the City. <br />Q: Did the Developer hire the consultant for the studies? <br />A: The studies were completed by a third party selected by the City of Santa <br />Ana. And the final reports gave the guidelines for the design requirements. <br />Q: What is the timeline of the project? <br />A: Not sure. It depends on the building and Planning process then the <br />construction phase. Once we have approvals from the city, construction will take <br />approximately 2 years. <br />Q: While the project is under construction, will the lost parking be available or <br />shifted? <br />A: This still needs to be determined. Past projects have been done in phases to <br />provide parking while the rest of the project is under construction. This is a <br />discussion that we need to have with the City. <br />Q: What is going to be done to prevent the residential and hotel from taking public <br />parking spaces? <br />A: The hotel will be valet parking; the residential will have a separate controlled <br />entrance for their assigned spaces. The residential guest parking will be a part of <br />the residential parking area. <br />Q: What is the rent rate for the apartments? <br />A: The rent rates have not been established at this time. <br />Q: What is the rent rate for the low-income affordable units? <br />A. This will be established by the City of Santa Ana housing formula. <br />Q: What are residential units going to be? <br />75A-202 <br />