My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH FOR CARIBOU INDUSTRIES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
11/17/2020
>
75A - PH FOR CARIBOU INDUSTRIES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 5:41:15 PM
Creation date
11/12/2020 3:25:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
11/17/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
495
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A: The hotel will be 10 floors and the residential will be 16 floors. <br />Q: Will all the residential units be apartments? <br />A: yes, all apartments, no condominiums. <br />Q: Were there any circulation studies done? <br />A: Yes, prior to the design process, a traffic and parking study was done. This <br />was a requirement of the City. <br />Q: Did the Developer hire the consultant for the studies? <br />A: The studies were completed by a third party selected by the City of Santa <br />Ana. And the final reports gave the guidelines for the design requirements. <br />Q: What is the timeline of the project? <br />A: Not sure. It depends on the building and Planning process then the <br />construction phase. Once we have approvals from the city, construction will take <br />approximately 2 years. <br />Q: While the project is under construction, will the lost parking be available or <br />shifted? <br />A: This still needs to be determined. Past projects have been done in phases to <br />provide parking while the rest of the project is under construction. This is a <br />discussion that we need to have with the City. <br />Q: What is going to be done to prevent the residential and hotel from taking public <br />parking spaces? <br />A: The hotel will be valet parking; the residential will have a separate controlled <br />entrance for their assigned spaces. The residential guest parking will be a part of <br />the residential parking area. <br />Q: What is the rent rate for the apartments? <br />A: The rent rates have not been established at this time. <br />Q: What is the rent rate for the low-income affordable units? <br />A. This will be established by the City of Santa Ana housing formula. <br />Q: What are residential units going to be? <br />75A-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.