My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING, INC.
Clerk
>
Contracts / Agreements
>
L
>
LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2024 9:53:30 AM
Creation date
4/28/2021 2:02:49 PM
Metadata
Fields
Template:
Contracts
Company Name
LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING, INC.
Contract #
N-2021-079
Agency
Public Works
Expiration Date
3/24/2024
Insurance Exp Date
1/1/1900
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATEMENT OF QUALIFICATIONS <br />REFERENCES <br />OXNARD UNION HIGH SCHOOL DISTRICT <br />TRACK & FIELD <br />(7) High schools for Oxnard Unified High School District where our scope of work includes <br />coordination with the District's Master Architect to finalize the layout and design of new Gateway <br />structures at each campus while also replacing natural grass football fields with new artificial <br />turf fields and in some cases replacing dilapidated tracks as well. We were also tasked with <br />addressing long term drainage issues at each campus while providing for additional amenities <br />such as basketball courts, tennis courts, and outdoor plazas. All (7) projects have been <br />approved through DSA and the first (3) are currently under construction. Our performance <br />on these projects has led the District to have us also prepare additional plans related to the <br />demolition and replacement of existing bleachers <br />at a few of these high school sites. <br />This project included work across 7 different <br />campuses. Exing transite pipe had to be <br />removed on three of the sites where we put <br />in new artificial turf football fields. Specifically <br />at Hueneme High School and Rio Mesa High <br />School, Our work included large irrigation <br />renovations. Several baseball fields, softball <br />fields, and open lawn areas needed to be <br />regraded to fix existing drainage issues so new <br />irrigation was designed and will be installed as <br />part of future phases of the construction. <br />ANOAPANpmMIAOL 11 <br />NITOMATIC CONTROLLER INb LEG INCIOE CTNNUMWER <br />PEOECTAL PER MANU EACNRERS MaAWTON INCIRUCIIUNC. <br />COORDINATE ELECTRIM CONNE NIN THE NELC. <br />21 <br />=— <br />V E. <br />MATCH LINE: SEE SHEET 1-1.0 <br />^ CC <br />a.R,b <br />15 <br />OITV OF SANTA ANA: REP NO: 20 128 <br />CABRILLO PARK IRRIGATION RESTORATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.