My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING, INC. (2)
Clerk
>
Contracts / Agreements
>
L
>
LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 12:31:05 PM
Creation date
5/6/2021 12:26:46 PM
Metadata
Fields
Template:
Contracts
Company Name
LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING, INC.
Contract #
A-2021-059
Agency
Public Works
Council Approval Date
4/20/2021
Expiration Date
4/19/2024
Insurance Exp Date
1/1/1900
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANTA ANA COLLEGE <br />P.A.M SITE IMPROVEMENTS <br />PLAZA DE ARTES, AMPHITHEATER, CENTRAL MALL <br />On the surface, this project was about designing shade opportunities for existing spaces and <br />reinventing a public plaza to inspire the next generation of students. The larger goal however, was <br />to help the College establish realistic budgets for each of the work areas. <br />We were tasked to develop multiple design options for three spaces on campus; (1) Plaza <br />de Artes, (2) Amphitheater, and (3) Central Mall. Each area had it's own program goals and <br />challenges with existing conditions. Our Design Team had to do extensive homework on all <br />existing utilities to prepare schematic design packages that were detailed enough that reliable cost <br />estimates could be generated based on the assumed scope of work involved for each. Design <br />work included site layout and design, trellis and shade structure detailing using metal framing and <br />tension span fabric, and cost estimating that ranged from $600K of improvements for the central <br />mall to more than $7 million of improvements to build a custom amphitheater. We provided (2) <br />options for each work area along with 3D renderings of each space and detailed estimates of <br />probable costs. The District is now using these documents as a basis of design in an effort to <br />secure funding for each work area in the future. <br />20 CITY OF SANTA ANA: REP NO: 20-130 <br />W1 STREET TRIANGULAR PARK RESTORATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.